07/28/2026
Full interior remodel for this lovely family! We had to do a lot of floor correction in the home due to foundation issues that were repaired before we started. Repaired all the damaged drywall from the foundation lift, scraped all ceilings, installed LVP flooring, new bathtubs in both bathrooms with all new fixtures, new vanity cabinets with quartz tops, painted kitchen cabinets, with stained butcher block countertop and single bowl sink, updated kitchen cabinet hardware, installed all new appliances, fresh paint all around and finished off with tearing down the deck and rebuilding with a roof for a screened in porch!