01/26/2026
Success in timber frame and SIP construction is won long before the crane arrives on-site.
While the installation phase is often the shortest part of the build, its speed is a direct result of meticulous pre-construction planning. By precision-engineering every joint and panel in a controlled factory environment, we reduce on-site labor. The result? A structure that goes from 1st floor deck to a shell, ready to be dried-in, in 2 weeks.
Cornerstone Timberframes
Marshall Drafting and Design
Sips of America
Great Lakes Superior Walls