05/07/2026
A typical outdoor living space takes about 6–12 weeks to complete once construction begins. The timeline depends on the size, features, permitting, and weather conditions.
Here’s a general breakdown:
2–4 weeks → Design, planning, and permits
1–2 weeks → Site prep and groundwork
2–6 weeks → Construction and installation
1–2 weeks → Finishing touches, lighting, landscaping, and inspections
LandscapeDesign
OutdoorKitchen
CustomHomes
BackyardTransformation
OutdoorSpaces