Patrick Gordon's Construction Limited

Patrick Gordon's Construction Limited For All Your Construction Needs

29/06/2023

Job Vacancy : Site HSSE Officer

Roles and responsibilities:

1) Ensure safe systems of work are followed.
2) Ensure toolbox and JSA’s are completed daily.
3) Ensure employee use the appropriate ppe per tasks.
4) Liaise with client on all HSE related issues.
5) Liaise with HSE Manager with site related HSE issues.
6) Ensure that employees, contractors, and site visitors conduct operations in accordance with the company’s Occupational Safety and Health Program.
7) Keep track of the site statistics and report to HSE Manager on a monthly basis.
8) Advise, assist and ensure compliance on appropriate selection and wearing of personal protective equipment (PPE) of all workers.
9) Comply with Patrick Gordon’s procedures concerning the reduction, reuse, recycling and recovery of waste.
10) To report all accidents and incidents to his/her supervisor and to comply with procedures outlined in the Accident/Incident Reporting Policy.

Requirements:

1) Five (5) years experience
2) Valid First Aid and Fire Certification
3) NEBOSH Certification/equivalent
4) Must have a phone with an active data plan
5)Must live in Chaguanas or environs

Duration : 7-8 months

Deadline for submission: July 4th 2023

Submit to [email protected], Subject: Site HSSE Officer - (Applicant Name)

24/05/2023

Job Vacancy : Office Assistant - Tenders and Project Administration

Roles and Responsibilities

1) Carries out administrative duties such as filing, typing, data entry, copying, binding, scanning, answering phone calls, schedules meetings and guides visitors, etc.

2) Pay utilities, maintain and track expenses using Excel.

3) Peachtree: invoice preparation, entry of payments, entry of funds and preparation reports.

4) Contract procurement [NIPDEC, NIDCO]: tender preparation, quotations & pre-qualifications

5) Project administration and project tracking: Tracking project performance, project costing [excel] , manage creditor accounts, ensuring all suppliers, employees and subcontractors are paid), authorized payments and reimbursements (employees and subcontractors), procurement of materials for projects and track overdue payments

Requirements and skills

1) Three (3) years experience in the Construction Industry

2) Associates degree in Business Management of equivalent

3) Proficiency in MS Office (MS Excel, MS Projects and MS PowerPoint, in particular)

4) Proficiency in MS Excel Functions (VLOOKUP, INDEX MATCH, IF, AND, XLOOKUP, COUNTA, COUNT, SUM, AVERAGE, CONCATENATE, SUBTOTAL, TODAY, DATEDIF, SUMIF, ETC)

5) Proficiency in Abode Acrobat (converting pdf to word, edit pdf, add header and footers on pdf, combine pdfs and sign pdf in particular)

6) Excellent time management skills and the ability to prioritize work

7) Knowledge of Peachtree

8. Knowledge of office management systems and procedures

9) Working knowledge of office equipment, like printers and fax machines

10) Attention to detail and problem solving skills

11) Excellent written and verbal communication skills

12) Strong record keeping and presentation skills

Conditions of employment:

1) All candidates are placed on a 2 month probation and offered a 3 month contract initially. Once the job performance is suitable to the organization then a two (2) year contract will be offered.

2) All laws in Trinidad & Tobago are to be upheld

Email: [email protected]

Deadline: 10th June 2023

Patrick Gordon's Construction will like to extend Christmas greetings to all our staff, supporters and stakeholders. Des...
25/12/2020

Patrick Gordon's Construction will like to extend Christmas greetings to all our staff, supporters and stakeholders. Despite the amount of uncertainty this year brought we were able to sustain our business which we are extremely grateful for. As the end of the year approaches and we reflect on all the opportunities we were offered and we felt motivated to bless 100 homes with food hampers with particular attention to the communities where we frequently work. Thanks again for all your support and God's richest blessing to you and your family. Merry Christmas.

20/03/2020
13/03/2020

Media Release : Kindly be advised, 87-SWRHA not a COVID-19 National Hotline.

B1/70 Paria Main Road Bridge, BlanchisseuseThe bridge structure is a single span beam and slab structure with AASHTO Typ...
28/02/2020

B1/70 Paria Main Road Bridge, Blanchisseuse

The bridge structure is a single span beam and slab structure with AASHTO Type III Precast Pre-stressed Concrete Beams 24-26m long. The concrete abutments are founded on deep spread footings with straight back wing walls. The deck elevations above sea level on the western and eastern end of the bridge are 28.17m and 27.97m respectively.

In cross-section, the proposed road width over the new bridge is 7.30 m wide with a 0.3m slipper drain and a 1.5m wide sidewalk on both sides. Reinforced parapet walls are included at the sides of the sidewalk to provide protection for pedestrians. The total cross section width of the new bridge will be 11.60m. There will be a 3.0m run on slab on both approaches with 90-degree long wing walls on all four sides of varying lengths from 8.0m to 12.0m.

The works also included road works for approximately 40m on the western approach and 40m on the eastern approach. River paving works will extend approximately 20.0m on either side of the bridge with Gabion baskets to be provided as river bank protection on all four sides of the paving works.

Completed : October 2019

Drainage and Irrigation WorksModeste StreetConstruction of Box Drain 146 m long x 500 mm base with side walls 500 mm on ...
14/02/2020

Drainage and Irrigation Works

Modeste Street

Construction of Box Drain 146 m long x 500 mm base with side walls 500 mm on property line and 300 mm on the roadside to join existing wall and 5 entrances

Completed : April 2019

Gerald Street

To construct 152 footpath 100m x 1.1m over an existing box drain with 52m 1.2m footpath long roadway. Along 152m of the roadway a slipper drain was constructed

Completed : October 2019

Successful training conducted with Patrick Gordon's Construction Limited employees in the following ares:Fire WardenDefe...
12/02/2020

Successful training conducted with Patrick Gordon's Construction Limited employees in the following ares:

Fire Warden
Defensive Driving (National Safety Council)
First Aid, CPR & AED (Emergency Care and Safety Institute)
Accident Investigation (TTOSH Act 2004)
Risk Assessment and Job Safety Analysis (TTOSH Act 2004)

Drainage and Irrigation WorksOttley Open Channel DrainConstructed an open channel box drain 40m long with base 2.4m wide...
06/02/2020

Drainage and Irrigation Works

Ottley Open Channel Drain

Constructed an open channel box drain 40m long with base 2.4m wide x 1.2m height which widen further 2m at the top at height of .6m. Connections were placed along the newly constructed drain walls to connect the existing 3 drains to the opening channel.

Completed : November 2019

01/02/2020
01/02/2020
B1/1 Maracas Royal Road Bridge ReconstructionThe Highways Division of the Ministry of Works conducted assessment exercis...
30/01/2020

B1/1 Maracas Royal Road Bridge Reconstruction

The Highways Division of the Ministry of Works conducted assessment exercises during the period 2010-2011. It was noted that the St Joseph Bridge was in a very dilapidated state. Its steel components and connections were heavily corroded to the extent that daylight could be observed shining through the members. The structure also vibrates excessively during the passage of heavy loads. In short the bridge has reached the end of its service life and to this end the Ministry has initiated reconstruction works. Work consisted of replacing the existing deck with a deck plank system, replacing the sidewalk deck slabs, repairing and replacing any cross beams, any necessary repairs to substructure and truss structure, river cleaning, necessary cross drainage works and river paving works. A small retaining wall will also be constructed in the river for bank protection and river training. A rehabilitated truss bridge now extends 36m in length over the St Joseph River. The original bridge structure had a wooden (mora plank) surface

Completed : October 2018

Address

Point Fortin
00000

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 12:00

Telephone

+18686485606

Website

Alerts

Be the first to know and let us send you an email when Patrick Gordon's Construction Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Patrick Gordon's Construction Limited:

Share

Category