Duba Green Solar Power Plant – Temporary Site Office CompletedWe are pleased to announce the successful completion of th...
13/06/2026

Duba Green Solar Power Plant – Temporary Site Office Completed

We are pleased to announce the successful completion of the Temporary Site Office for the Duba Green Solar Power Plant Project.

The scope of work was executed with a strong commitment to quality, safety, and timely delivery, ensuring that the site office is fully prepared to support project operations and site management activities.

This milestone reflects the dedication, hard work, and coordination of our team in delivering the project according to the required standards and schedule.

We extend our appreciation to all engineers, supervisors, technicians, and workers who contributed to the successful completion of this phase.

Project: Duba Green Solar Power Plant
Scope: Temporary Site Office
Status: Completed Successfully ✅

13/06/2026

Construction of site Temporarily office facility at Duba green solar power plant

Successfully completed the installation of galvanized steel equipment support structures and associated high-voltage yar...
10/06/2026

Successfully completed the installation of galvanized steel equipment support structures and associated high-voltage yard equipment at the Najran Battery Energy Storage Substation (BESS).

The scope included the fabrication, hot-dip galvanizing, supply, er****on, alignment, and final installation of steel lattice support structures designed to carry critical substation equipment. All works were executed in accordance with project specifications, engineering drawings, and the highest safety and quality standards.

These structures play a vital role in supporting high-voltage electrical equipment, ensuring mechanical stability, electrical clearance compliance, and long-term reliability of the substation infrastructure.

We are proud to have delivered this project successfully through the dedication of our supervisors, technicians, and site workforce.

📍 Najran Battery Energy Storage Substation (BESS)
✅ Steel Structure Installation Completed
✅ High-Voltage Equipment Supports Installed
✅ Quality, Safety & Engineering Excellence Delivered

Successfully completed the Um Al Joud 380/132kV Substation Project in Makkah with a commitment to quality, safety, and e...
10/06/2026

Successfully completed the Um Al Joud 380/132kV Substation Project in Makkah with a commitment to quality, safety, and excellence. Proud to have contributed to strengthening the power infrastructure that supports the growth and development of the Kingdom. Delivering every project with precision, reliability, and the highest industry standards.

1-Handrails
2-Cage ladders
3-Sliding gates fire resistant
4-Crash barrier
5-Water sunshades
6-Transformer Grading
7-Access stairs for reactors and HVAC
8-Monorail Beams
9-Barbed wire and fencing
10-Emergency exit system.

Arafat-1 extension Makkah complete steel work.
22/02/2025

Arafat-1 extension Makkah complete steel work.

Al-Fara 380-KV Substation, King Khaled University Project, Aseer Region.
04/12/2022

Al-Fara 380-KV Substation, King Khaled University Project, Aseer Region.

Makkah Housing2, telecom and capacitor fence and access platform with safety handrail.
19/11/2021

Makkah Housing2, telecom and capacitor fence and access platform with safety handrail.

Aside from developing the foundation for modern physics, Einstein understood that in order to make the biggest breakthro...
13/08/2021

Aside from developing the foundation for modern physics, Einstein understood that in order to make the biggest breakthroughs, you have to make mistakes.

Through mistakes, you learn. Through failure, you explore.
. Here it is, the best way to use your space for car parking and produce electricity ⚡️ at same time and a module to display your idea to your clients, a solar car parking which produce a huge electricity for your offices.

Allhumdullilah by the grace of Allah SW completed yet another site mobilization of Saudi Electricity project under the s...
18/12/2020

Allhumdullilah by the grace of Allah SW completed yet another site mobilization of Saudi Electricity project under the supervision of our client at Turaif Waad Al-Shamaal Modon.

1-Porto cabins manufacturing and placing with complete water,drain and electric supply
2- fabrication and installation of temporary sign board
3- supply and installation of fence
4- fabrication and installation of parking shed
5- fabrication and installation of site access gate
6-casting of septic tank temporary.

Permanent signboard for Arafat Substation Extension.
10/10/2020

Permanent signboard for Arafat Substation Extension.

Address

Al Barakah
Jeddah
22632

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Saturday 8am - 5pm
Sunday 8am - 5pm

Telephone

+966591355767

Alerts

Be the first to know and let us send you an email when Zahi Maas General Contracting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share