10/06/2026
Successfully completed the installation of galvanized steel equipment support structures and associated high-voltage yard equipment at the Najran Battery Energy Storage Substation (BESS).
The scope included the fabrication, hot-dip galvanizing, supply, er****on, alignment, and final installation of steel lattice support structures designed to carry critical substation equipment. All works were executed in accordance with project specifications, engineering drawings, and the highest safety and quality standards.
These structures play a vital role in supporting high-voltage electrical equipment, ensuring mechanical stability, electrical clearance compliance, and long-term reliability of the substation infrastructure.
We are proud to have delivered this project successfully through the dedication of our supervisors, technicians, and site workforce.
📍 Najran Battery Energy Storage Substation (BESS)
✅ Steel Structure Installation Completed
✅ High-Voltage Equipment Supports Installed
✅ Quality, Safety & Engineering Excellence Delivered