ERGIO - Wooden Constructions

ERGIO - Wooden Constructions We are a well-established company in the wooden industry. We manufacture prefab. wooden construction. Prefab Wooden Constructions

๐Ÿ“ข Angajฤƒm Motostivuitorist pentru fabrica noastrฤƒ de construcศ›ii din lemn โ€“ Comฤƒneศ™tiโœ”๏ธ Atestat ISCIR โ€“ constituie un av...
02/09/2026

๐Ÿ“ข Angajฤƒm Motostivuitorist pentru fabrica noastrฤƒ de construcศ›ii din lemn โ€“ Comฤƒneศ™ti

โœ”๏ธ Atestat ISCIR โ€“ constituie un avantaj

โœ”๏ธ Ce oferim:

โ€ข program de lucru de luni pรขnฤƒ vineri;
โ€ข salariu de la 3.400 lei net pentru persoanele cu atestat ISCIR;
โ€ข salariu de la 3.200 lei net pentru persoanele fฤƒrฤƒ atestat โ€“ asigurฤƒm noi ศ™colarizarea necesarฤƒ;
โ€ข salariul poate creศ™te รฎn funcศ›ie de experienศ›ฤƒ ศ™i performanศ›ฤƒ;
โ€ข asigurฤƒm transport de la Autogara Comฤƒneศ™ti pรขnฤƒ la fabricฤƒ ศ™i retur.

๐Ÿ“ž Pentru mai multe informaศ›ii, ne poศ›i contacta la: 0721 234 924 / 0234 374 131

๐Ÿ“ Sau te aศ™teptฤƒm direct la sediul nostru: Strada Cireศ™oaia, nr. 233, Comฤƒneศ™ti.

Alฤƒturฤƒ-te echipei noastre!

A timber structure does not end at the factory gate. At ERGIO, we stay involved until the contracted timber scope is com...
01/09/2026

A timber structure does not end at the factory gate.

At ERGIO, we stay involved until the contracted timber scope is completed on site.

๐Ÿš› We plan transport and loading around the project and assembly sequence.
๐Ÿชต Components are prepared for efficient handling and installation.
๐Ÿ‘ท Assembly can be carried out by ERGIO or by specialist partners.
๐Ÿ“ž Our technical team remains available by video and telephone whenever support is needed.

And very often, we are there in person too.

๐Ÿ“ We frequently visit construction sites to follow progress, coordinate directly with site teams and provide technical input where it matters most.

For complex and large-scale timber projects, continuity between engineering, production, logistics and assembly makes a real difference.

From factory precision to on-site ex*****on.

ERGIO โ€“ The Industrial Standard.

๐Ÿ“ฉ Have a timber project in development? Send us your plans and letโ€™s discuss how we can take it from engineering to completed structure.

The sea view gets the attention. The structure behind it gets ours. ๐Ÿ‡ช๐Ÿ‡ธ๐ŸŒŠA new Ergio project is taking shape on the Spanis...
28/08/2026

The sea view gets the attention. The structure behind it gets ours. ๐Ÿ‡ช๐Ÿ‡ธ๐ŸŒŠ

A new Ergio project is taking shape on the Spanish coast, in a setting where architecture opens directly towards the sea.

But behind that view sits a carefully engineered wall system, designed layer by layer for structure, insulation, protection and long-term performance.

For the external timber frame walls, the build-up includes:
โ€ข a 45 ร— 145 mm timber structure, forming the structural core
โ€ข 150 mm mineral wool, providing thermal insulation within the timber frame
โ€ข 12 mm OSB sheathing
โ€ข a high-performance membrane, supporting airtightness and moisture management
โ€ข plasterboard on the interior side, providing the internal finishing layer
โ€ข expanded polystyrene on the exterior
โ€ข reinforced adhesive and finishing coats, preparing the faรงade for its final exterior finish

Inside, selected partition walls use a lighter timber structure combined with OSB and acoustic mineral wool, helping improve sound separation between interior spaces. ๐Ÿ”‡

Different materials. Different functions. One coordinated system. โš™๏ธ

That is the real value of prefabrication.

Not simply producing walls in a factory, but understanding how every layer contributes to the performance of the finished building before it reaches the site.

Because in timber construction, precision is not only about dimensions.

It is also about how structure, insulation, membranes, sheathing and finishes work together as one system.

And in a location like this, the engineering comes with quite a backdrop. ๐ŸŒŠ๐Ÿ—๏ธ

๐—˜๐—ฟ๐—ด๐—ถ๐—ผ โ€“ ๐—ง๐—ต๐—ฒ ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ.

Working on a timber project in Spain or elsewhere in Europe?

Send us your architectural plans and technical requirements. Weโ€™ll turn them into a production-ready timber structure.

๐Ÿ“ฉ [email protected]

25/08/2026

You see a panel. We see everything that has already been solved before it reaches the site. ๐Ÿ‘€

In our latest reel, Daily Precision, a few seconds of factory footage show different moments from the production process.

But what you see and what we see are not quite the same.

You see a Timber Frame panel taking shape.
We see geometry, tolerances and assembly logic coming together.

You see openings being cut for windows and doors.
We see fewer adjustments left for the construction site. ๐Ÿ“

You see insulation, smart membranes and OSB being installed.
We see more work completed under controlled factory conditions.

You see finishing layers applied to the panels.
We see another stage moved away from weather, improvisation and site variability.

You see beams being manufactured and complex cuts performed by our Hundegger Robot-Drive. ๐Ÿค–
We see digital information becoming physical accuracy.

That is what industrial prefabrication is really about.

Not simply doing more inside a factory, but moving complexity upstream, where it can be engineered, controlled and repeated.

So when the structure reaches the site, the team is not starting from zero.

They are continuing a process that has already been carefully prepared. โš™๏ธ

๐—˜๐—ฟ๐—ด๐—ถ๐—ผ โ€“ ๐—ง๐—ต๐—ฒ ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ.

Working on a timber project where precision, sequencing and predictable ex*****on matter?

Send us your plans. Weโ€™ll take it from engineering to a production-ready structure.

๐Ÿ“ฉ [email protected]

The final shape of Village Seniors 2 is now coming into view. ๐Ÿ‡ซ๐Ÿ‡ทAfter following this project through several stages, the...
20/08/2026

The final shape of Village Seniors 2 is now coming into view. ๐Ÿ‡ซ๐Ÿ‡ท

After following this project through several stages, the development is moving quickly towards completion.

The 17 individual timber-frame homes are already well advanced. Now, our assembly team is focused on the next major part of the site: the apartment building, which will include 13 apartments ranging from 45 to 80 mยฒ. ๐Ÿ—๏ธ

This stage brings a different level of coordination.

A multi-unit building means more interfaces, more sequencing, more structural connections and more elements that need to arrive on site exactly when they are needed.

That is where industrial preparation becomes visible.

From factory-controlled prefabrication to assembly planning and on-site ex*****on, every stage is connected to the next. โš™๏ธ

And this is exactly what a development like Village Seniors 2 requires: not isolated structures, but a repeatable, controlled process capable of carrying an entire residential programme forward.

Step by step, the project is getting closer to its final form.

17 individual homes.
13 apartments.
One coordinated development. โœ…

Ergio โ€“ The Industrial Standard.

Planning a residential development with multiple buildings or phases?

Send us your plans and letโ€™s discuss how to turn them into a production-ready timber structure programme.

๐Ÿ“ฉ [email protected]

The best proof of an industrial standard is not what we say about it.It is what the finished building proves under test....
18/08/2026

The best proof of an industrial standard is not what we say about it.
It is what the finished building proves under test. ๐Ÿ—๏ธ

For the Village Senior residential development in France, our French partners shared this result after the acoustic testing:

โ€œThe acoustic test in Villerest was passed, with results well below the required limit. It is very rare to achieve a result this good. Bravo, Ergio!โ€

For us, that last sentence says a lot. ๐ŸŽฏ

A residential development of this scale is not about producing one good building. It is about achieving the same level of precision, consistency and performance across an entire project.

From engineering and prefabrication to production control, logistics and assembly, every stage has to work as part of the same disciplined process. โš™๏ธ

Because when dozens of components, interfaces and construction stages come together, quality cannot depend on chance.

It has to be built into the system.

And when the final tests confirm it, the results speak louder than any presentation ever could. โœ…

๐—˜๐—ฟ๐—ด๐—ถ๐—ผ. ๐—ง๐—ต๐—ฒ ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ.

Planning a residential development or a technically demanding timber project?
Send us your plans.
๐Ÿ“ฉ[email protected]

A handshake, a set of keys and feedback that made the whole team proud. ๐Ÿค๐Ÿ”‘๐Ÿ‡ฌ๐Ÿ‡งAt handover, the project owner shared: โ€œ๐——๐—ฒ๐—ฎ๐—ฟ...
13/08/2026

A handshake, a set of keys and feedback that made the whole team proud. ๐Ÿค๐Ÿ”‘๐Ÿ‡ฌ๐Ÿ‡ง

At handover, the project owner shared: โ€œ๐——๐—ฒ๐—ฎ๐—ฟ ๐—ฎ๐—น๐—น, ๐—œ ๐—ต๐—ฎ๐˜ƒ๐—ฒ ๐—ท๐˜‚๐˜€๐˜ ๐˜๐—ต๐—ถ๐˜€ ๐—บ๐—ถ๐—ป๐˜‚๐˜๐—ฒ ๐˜๐—ต๐—ฎ๐—ป๐—ธ๐—ฒ๐—ฑ ๐˜๐—ต๐—ฒ ๐—˜๐—ฟ๐—ด๐—ถ๐—ผ ๐˜๐—ฒ๐—ฎ๐—บ ๐—ผ๐—ป ๐—ฏ๐—ฒ๐—ต๐—ฎ๐—น๐—ณ ๐—ผ๐—ณ ๐˜๐—ต๐—ฒ ๐—ด๐—ผ๐—ผ๐—ฑ ๐—ฝ๐—ฒ๐—ผ๐—ฝ๐—น๐—ฒ ๐—ผ๐—ณ ๐—”๐—น๐—น ๐—–๐—ฎ๐—ป๐—ป๐—ถ๐—ป๐—ด๐˜€. ๐—ช๐—ฒ ๐—ณ๐—ผ๐—ฟ๐—บ๐—ฎ๐—น๐—น๐˜† ๐—ต๐—ฎ๐˜ƒ๐—ฒ ๐˜๐—ต๐—ฒ ๐—ธ๐—ฒ๐˜†๐˜€.โ€

A few words that say a great deal about the result: the project is complete, the keys are in the clientโ€™s hands and another Ergio structure is now part of the UK landscape.
Behind this compact project sits a fully coordinated timber system.

The exterior walls feature 45 ร— 145 mm framing, glass mineral wool insulation, vapour control, OSB, a highly breathable membrane, plasterboard internally and 28 mm vertical cladding externally.

Inside, 45 ร— 95 mm framing is combined with acoustic insulation, vapour control, OSB and plasterboard.

A smaller footprint does not mean a smaller standard. The same engineering discipline, factory control and technical consistency apply at every scale. โš™๏ธ

We are already active in the UK market. And we are ready to bring this experience to larger residential developments, hospitality buildings and multi-unit timber projects across the country.

Have a timber project planned in the UK? Send us the architectural plans and technical requirements. Letโ€™s build the production system behind it.

๐Ÿ“ฉ[email protected]

๐—˜๐—ฟ๐—ด๐—ถ๐—ผ - ๐—ง๐—ต๐—ฒ ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ.

A timber kit should arrive on site with fewer surprises than the weather forecast. ๐Ÿ“ฆThat means logistics cannot begin af...
11/08/2026

A timber kit should arrive on site with fewer surprises than the weather forecast. ๐Ÿ“ฆ

That means logistics cannot begin after production is finished. It must be considered from the start, alongside engineering, packaging and the site programme.

1. Where can ERGIO deliver?

We coordinate shipments for international B2B projects across Europe and can assess other destinations based on the specific requirements of each project. Route, feasibility, lead time and commercial conditions are confirmed for every shipment.

2. Can the packages follow the assembly sequence?

Yes. They can be organised by project, building, unit, level, elevation, roof zone or assembly phase.

Because a carefully engineered structure should not arrive on site as one enormous timber puzzle.

3. Can ERGIO assemble the kit?

Depending on the country, programme, team availability and site conditions, ERGIO can provide assembly services. The structure may also be installed by a local partner or the clientโ€™s specialist crew, with remote or on-site support from our team as agreed.

Different projects require different logistics.

The standard should remain the same: clear planning, coordinated ex*****on and fewer unanswered questions on site.

Planning an international timber project?

Send us your architectural plans and letโ€™s define the right delivery, packaging and assembly strategy before production begins.

๐—˜๐—ฅ๐—š๐—œ๐—ข โ€“ ๐—ง๐—ต๐—ฒ ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ.

Dutch architecture rarely plays it safe. Neither do we. ๐Ÿ‡ณ๐Ÿ‡ฑThatched roofs. Unexpected geometries. Facades combining brick...
06/08/2026

Dutch architecture rarely plays it safe. Neither do we. ๐Ÿ‡ณ๐Ÿ‡ฑ

Thatched roofs. Unexpected geometries. Facades combining brick, thermally treated timber and fibre-cement panels.

These are the projects we particularly enjoy delivering in the Netherlands: houses with a strong local identity that demonstrate just how versatile engineered timber construction can be.

Behind the architecture, every layer follows a precise technical logic.

The external walls are built around a 45 ร— 195 mm timber frame, with two layers of basalt mineral wool insulation, a vapour control membrane, OSB, a highly breathable membrane and plasterboard.

The internal load-bearing walls use a 45 ร— 145 mm timber frame, completed with acoustic basalt mineral wool, OSB and plasterboard.

Different finishes. Complex forms. One coordinated structural system, engineered and prefabricated for predictable ex*****on on site. โš™๏ธ

Because working with timber is not about simplifying architecture.

It is about creating the industrial precision that allows ambitious architecture to be built.

Bring us the geometry. We will engineer the system behind it. ๐Ÿ—๏ธ

๐—˜๐—ฟ๐—ด๐—ถ๐—ผ โ€“ ๐—ง๐—ต๐—ฒ ๐—œ๐—ป๐—ฑ๐˜‚๐˜€๐˜๐—ฟ๐—ถ๐—ฎ๐—น ๐—ฆ๐˜๐—ฎ๐—ป๐—ฑ๐—ฎ๐—ฟ๐—ฑ.

Our helmet found the hammock. Our inbox didnโ€™t. ๐ŸŒดโ›‘๏ธThe Ergio factory is taking its scheduled summer break, but we havenโ€™...
04/08/2026

Our helmet found the hammock. Our inbox didnโ€™t. ๐ŸŒดโ›‘๏ธ

The Ergio factory is taking its scheduled summer break, but we havenโ€™t switched the whole operation to holiday mode.

A reduced team of sales representatives and engineers remains available for new requests, technical questions and unexpected situations on site.

So, while production takes a well-earned pause, communication stays open and projects keep moving forward.

Have a request? Send it our way. Weโ€™re here.

Ergio โ€“ The Industrial Standard.

Address

Ciresoaia 233
Comanesti
605200

Opening Hours

Monday 09:00 - 18:00
Tuesday 09:00 - 18:00
Wednesday 09:00 - 18:00
Thursday 09:00 - 18:00
Friday 09:00 - 18:00
Saturday 09:00 - 14:00

Telephone

+40234374131

Alerts

Be the first to know and let us send you an email when ERGIO - Wooden Constructions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share