Pergola Project โ€“ Complete Installation Process โœ…

We successfully completed a pergola project with a full step-by-step installation process, ensuring quality and durability at every stage.

๐Ÿ”น 1. Site Preparation
Proper cleaning, leveling, and marking were done to ensure accurate layout and strong foundation.

๐Ÿ”น 2. Post Installation
Main structural posts were installed with proper alignment and fixing to ensure stability and load-bearing capacity.

๐Ÿ”น 3. Pergola Frame Fixing
The top structure was installed and adjusted carefully according to design and site dimensions.

๐Ÿ”น 4. Glass Installation
High-quality glass panels were fixed to provide protection and a modern aesthetic finish.

๐Ÿ”น 5. WPC Wooden Decking
Surface preparation and leveling were done before installing WPC decking for durability and a premium look.

๐Ÿ”น 6. Electrical Works
Complete electrical installation including lighting was carried out to enhance functionality and ambiance.

๐Ÿ”น 7. Finishing & Detailing
Final touch-ups, cleaning, and detailing were completed to deliver a perfect finished project.

๐Ÿ“ Project completed with high standards and client satisfaction.

๐Ÿ“ฉ For pergola, fit-out, and construction work, feel free to contact.