27/05/2026
🔵 Blue Army Construction & Consulting | Today’s Progress 🔵
Another productive day in the field.
One of our teams returned to complete the reinstallation of a porch canopy after yesterday’s repairs to the exterior water drip edge/dropper. We allowed the concrete and paint enough cure time before reinstalling to avoid damaging the finished work. During reinstallation, we also replaced the previously removed rusted hardware with marine-grade stainless steel nuts and fasteners to help prevent corrosion and make future maintenance easier—especially in our coastal environment.
At another apartment complex, our crew handled common area cleaning and maintenance after the heavy rains we’ve been getting across Puerto Rico. Between the wet weather and the increase of insects and nighttime critters that tend to come out after storms, the team focused on restoring the shared spaces and keeping the property clean and comfortable for residents.
A one-man service team completed a quick plumbing repair by replacing worn shower valves where damaged threads were preventing one side from operating properly. Water flow was restored and the fixture is back in service.
That same team later responded to one of our work trucks after a blown coolant hose caused an unexpected breakdown. The damaged hose was replaced, coolant was topped off to proper level, and the truck was back on the road and ready to keep moving.
Meanwhile, another crew continued progress on the roof tile sealing project, wrapping up the primer stage on the tejas and gathering paint and materials needed for the next phase.
Heavy rain cut the day shorter than expected, but the team still made solid progress and kept everything moving forward.
Thank you for trusting Blue Army Construction & Consulting. Rain or shine, we show up and get it done. 💪🏽🏗️🌴