TIME LINE Construction -SMC Pvt Ltd

Call Directions Website Contact the business

TIME LINE Construction -SMC Pvt Ltd Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from TIME LINE Construction -SMC Pvt Ltd, Construction Company, Office #1 , 1st floor BTG Plaza , near shaheen steel, service road shakriyal kanapul rawalpindi, Rawalpindi.

TIME LINE CONSTRUCTION SMC Pvt ltd is a fast growing construction company working in the field of construction.contact details WhatsApp 03115119485 , 03465645344
[email protected]

Gulberg green  farmhouse project gray structure completed.
07/09/2026

Gulberg green farmhouse project gray structure completed.

Parkview City Project By TIME LINE Construction -SMC Pvt Ltd The project started from excavation , footings, brick work ...
16/08/2026

Parkview City Project
By
TIME LINE Construction -SMC Pvt Ltd

The project started from excavation , footings, brick work and concrete work shutting work and steel fixing work and plaster work.

16/08/2026
Behind the Walls: Washroom Plumbing in Progress*A good washroom starts before the tiles. Here’s how we’re building leak-...
13/08/2026

Behind the Walls: Washroom Plumbing in Progress*

A good washroom starts before the tiles.
Here’s how we’re building leak-free washrooms at our site:

1. *Clean Start* → All washrooms cleaned & prepped
2. *Smart Layout* → Fixtures marked for perfect space utilization
3. *Ulta Waterproofing* → Full membrane to stop seepage to lower floors
4. *PPRC Pipes* → Heat-fused joints, pressure tested for zero leaks
5. *UPVC Drainage* → Correct slope to avoid choking
6. *Sunken Slab Concrete* → With slope to floor trap for complete water exit

This is how you build homes that stay beautiful for years.

Time Line construction smc Pvt ltd.External plaster work.Good Quality External Plaster = Protection + Beauty + Strength*...
13/08/2026

Time Line construction smc Pvt ltd.
External plaster work.

Good Quality External Plaster = Protection + Beauty + Strength*

At Gulberg Green we delivered:
✅ *1:3 Strong Mix* - No seepage, No cracks
✅ *2 Coat System 19mm* - Double protection from weather
✅ *Proper Curing 7 Days* - The secret to durable walls
✅ *Mesh at Joints* - Zero hairline cracks guaranteed

From foundation to finishing, we don’t take shortcuts.
For quality construction in Islamabad, contact us.



---

*How We Do 1st Class External Plaster at Gulberg Green:*

*Step 1: Prep* → Clean brickwork, rake joints, pre-wet wall
*Step 2: Dab* → Set dots for perfect 19mm thickness & plumb
*Step 3: 1st Coat 12mm* → 1:3 mortar, scratch for key, cure 3 days
*Step 4: 2nd Coat 7mm* → Finish coat, wooden float for texture
*Step 5: Curing* → Water cure twice daily for 7 days
*Step 6: QC* → Check with straight edge, thread & spirit level

This methodology ensures *weatherproof, crack-free walls* that stand against rain, heat & time.

Proud team work at Gulberg Green Project.

Time Line construction smc Pvt ltd Gulberg Green 💚 farm house project today pics.
12/08/2026

Time Line construction smc Pvt ltd

Gulberg Green 💚 farm house project today pics.

Time Line construction smc Pvt ltd.Office Renovation work in Islamabad .1) Ceiling work.2) Wall paneling 3) Electric wor...
12/08/2026

Time Line construction smc Pvt ltd.

Office Renovation work in Islamabad .
1) Ceiling work.
2) Wall paneling
3) Electric work
4) Networking
5) plumbing work
7) Tile Fixing work
8) wooden floor
9) wooden blinds

Time Line construction smc Pvt ltd.*1st Class Brick - Quality Standards in Pakistan**1. Physical Properties*- *Size*: St...
11/08/2026

Time Line construction smc Pvt ltd.

*1st Class Brick - Quality Standards in Pakistan*

*1. Physical Properties*
- *Size*: Standard size = *9" x 4.5" x 3"* or *225mm x 112mm x 75mm*
Tolerance: ±3mm. All bricks should be uniform in size.
- *Shape*: True rectangular, sharp edges & corners. No warping, no cracks.
- *Color*: Deep red, coppery, or cherry color after burning. Uniform color throughout.
- *Texture*: Smooth surface, compact, free from nodules & lumps.

*2. Strength & Durability*
- *Compressive Strength*: *Min 2500 PSI / 17.5 N/mm²* when tested
For load bearing walls in hospitals/schools: *3500 PSI* preferred
- *Water Absorption*: *Max 20%* by weight after 24hr immersion
Formula: `(W2-W1)/W1 x 100`. Less absorption = more durable
- *Efflorescence*: *Nil to Slight*. No white salt patches. Must be "Nil" for facing work.

*3. Sound & Hardness Test*
- *Sound Test*: When 2 bricks are struck, should give a *clear ringing metallic sound*. Dull sound = underburnt
- *Hardness*: Should not leave scratch when scratched with fingernail.
Should not break when dropped from 1 meter on hard ground.

*4. Manufacturing Quality*
- *Burning*: Well burnt in kiln. Not overburnt or underburnt.
- *Material*: Made from good clay, free from lime nodules, kankar, organic matter
- *No Defects*: No cracks, chips, or flaws. Frog mark 10mm deep should be present.

*5. Other Checks*
- *Weight*: Approx *3.0 - 3.5 kg* per brick
- *Frog*: Depression on top for better mortar bond
- *Usage*: Suitable for all load bearing walls, facing work, and where good appearance is required

*Quick Site Test for 1st Class Brick*
**Test** **Result for 1st Class**
**Visual** Uniform size, sharp edges, cherry red
**Sound** Clear ringing sound
**Water** 20% max absorption, no bubbles for long time
**Drop** Does not break from 1m height
**Scratch** No scratch with nail
*Where Used:*
External walls, load bearing walls, compound walls, plinth work, and any exposed brickwork in Indus Hospital, schools.

Time Line construction smc Pvt ltd.Plaster work methodology *🛠️ Premium Plaster Work | Smooth Walls, Strong Finish*We pr...
11/08/2026

Time Line construction smc Pvt ltd.

Plaster work methodology

*🛠️ Premium Plaster Work | Smooth Walls, Strong Finish*

We provide expert *Cement Plaster Work* for residential, commercial & hospital projects.

*Our Process:*
1. *Surface Prep*: Brick masonry cleaned, joints raked, surface watered
2. *Dab & Line*: Proper leveling with plumb bob & dories. No uneven walls
3. *1:4 Cement Sand Ratio* for internal walls | *1:3* for external
4. *12mm thick Internal* | *19mm thick External* plaster in 2 coats
5. *Curing*: 7 days water curing for zero cracks & maximum strength

*Result*: Crack-free, durable walls ready for paint & tile work

Address

Office #1 , 1st Floor BTG Plaza , Near Shaheen Steel, Service Road Shakriyal Kanapul Rawalpindi
Rawalpindi

Alerts

Be the first to know and let us send you an email when TIME LINE Construction -SMC Pvt Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to TIME LINE Construction -SMC Pvt Ltd:

Shortcuts

Share