Abas Construction Services

Directions

Abas Construction Services WE BUILD AND DESIGN

Update for 2 storey Apartment Building w/ 6 rooms We Build and Design direct message lang kayo dito sa page salamat po.
28/08/2026

Update for 2 storey Apartment Building w/ 6 rooms

We Build and Design direct message lang kayo dito sa page salamat po.

WE BUILD AND DESIGNPlano mo ba mag negosyo o mag patayo ng Pickleball Court? Are you planning to build your dream house,...
01/08/2026

WE BUILD AND DESIGN

Plano mo ba mag negosyo o mag patayo ng Pickleball Court?

Are you planning to build your dream house, commercial building, renovation and others.

Contact us now at 09702791243 or message us on our FB Page
Email: [email protected]

We Offer Complete set of plans signed and sealed for building permit, occupancy permit and house loan requirements๐Ÿฅฐ

โ˜‘๏ธ๐€๐ซ๐œ๐ก๐ข๐ญ๐ž๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Schematic Floor Plans
-Exterior 3d Models
- Exterior Perspective
-Architectural Floor Plans
-Elevations and Sections
-Reflected Ceiling and Lighting Plan
-Schedule of Doors and Windows
-Signed and Sealed by registered & Licensed Architect

โ˜‘๏ธ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Foundation and Floor framing Plans
-Roof Framing Plans and Details
-Schedule and Details of Footing, Columns and Beams
-Structural Design Analysis
-Signed and Sealed by Registered & Licensed Civil/Structural Engineer

โ˜‘๏ธ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Electrical Lighting Plan
-Electrical Power Plan
-Schedule of Loads, Electrical Notes and Symbols
-Signed and Sealed by Registered &
Licensed Professional Electrical Engineer

โ˜‘๏ธ๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  ๐๐ฅ๐š๐ง๐ฌ
-Water Supply Plan
-Storm and Surface Drain Plan
-Isometric Layout, Plumbing Details, Notes and Symbols
-Signed and Sealed by Registered & Licensed Master Plumber

โ˜‘๏ธ๐๐ฅ๐ฎ๐ž๐ฉ๐ซ๐ข๐ง๐ญ๐ฌ
5 sets A1 Size
Signed and Sealed by the Architect and Engineers

โ˜‘๏ธ๐’๐ฉ๐ž๐œ๐ข๐Ÿ๐ข๐œ๐š๐ญ๐ข๐จ๐ง๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ข๐ฅ๐ฅ ๐จ๐Ÿ ๐Œ๐š๐ญ๐ž๐ซ๐ข๐š๐ฅ๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐ž๐ซ๐ฆ๐ข๐ญ ๐…๐จ๐ซ๐ฆ๐ฌ
Signed and Sealed by the Architect and Engineers

WE BUILD AND DESIGNAre you planning to build your dream house, commercial building, renovation and other.Contact us now ...
31/07/2026

WE BUILD AND DESIGN

Are you planning to build your dream house, commercial building, renovation and other.

Contact us now at 09702791243 or message us on our FB Page
Email: [email protected]

We Offer Complete set of plans signed and sealed for building permit, occupancy permit and house loan requirements๐Ÿฅฐ

โ˜‘๏ธ๐€๐ซ๐œ๐ก๐ข๐ญ๐ž๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Schematic Floor Plans
-Exterior 3d Models
- Exterior Perspective
-Architectural Floor Plans
-Elevations and Sections
-Reflected Ceiling and Lighting Plan
-Schedule of Doors and Windows
-Signed and Sealed by registered & Licensed Architect

โ˜‘๏ธ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Foundation and Floor framing Plans
-Roof Framing Plans and Details
-Schedule and Details of Footing, Columns and Beams
-Structural Design Analysis
-Signed and Sealed by Registered & Licensed Civil/Structural Engineer

โ˜‘๏ธ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Electrical Lighting Plan
-Electrical Power Plan
-Schedule of Loads, Electrical Notes and Symbols
-Signed and Sealed by Registered &
Licensed Professional Electrical Engineer

โ˜‘๏ธ๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  ๐๐ฅ๐š๐ง๐ฌ
-Water Supply Plan
-Storm and Surface Drain Plan
-Isometric Layout, Plumbing Details, Notes and Symbols
-Signed and Sealed by Registered & Licensed Master Plumber

โ˜‘๏ธ๐๐ฅ๐ฎ๐ž๐ฉ๐ซ๐ข๐ง๐ญ๐ฌ
5 sets A1 Size
Signed and Sealed by the Architect and Engineers

โ˜‘๏ธ๐’๐ฉ๐ž๐œ๐ข๐Ÿ๐ข๐œ๐š๐ญ๐ข๐จ๐ง๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ข๐ฅ๐ฅ ๐จ๐Ÿ ๐Œ๐š๐ญ๐ž๐ซ๐ข๐š๐ฅ๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐ž๐ซ๐ฆ๐ข๐ญ ๐…๐จ๐ซ๐ฆ๐ฌ
Signed and Sealed by the Architect and Engineers

06/07/2026

๐Ÿ€๐Ÿ”ฅ CBC CLUB โ€“ 2ND SEASON ๐Ÿ”ฅ๐Ÿ€
๐Ÿ“… OFFICIAL GAME SCHEDULE

โฐ Call Time: 6:00 PM
๐Ÿšจ Game Starts: 6:30 PM SHARP

๐Ÿ“ Venue: Martinez Gym, Barangay Zone 4
๐Ÿ“… Tuesday | July 07, 2026

๐Ÿ€ 6:30 PM โ€“ 7:30 PM
๐Ÿ”ฅ BRC x Ms Store ๐Ÿ†š Abas Construction Services

๐Ÿ€ 7:30 PM โ€“ 8:30 PM
๐Ÿ”ฅ ABC/KN06 ๐Ÿ†š Amigos/2K07

๐Ÿ’ฅ Two exciting matchups. Four determined teams. One unforgettable basketball night!

๐Ÿ“ฃ Bring your family and friends, cheer for your favorite team, and experience another thrilling night of basketball at CBC Club โ€“ 2nd Season!

๐Ÿ’™ Play with Heart. Respect the Game. One CBC, One Family! ๐Ÿ€

WE BUILD AND DESIGNFOR YOUR PLANS AND DESIGNSGET DESIGN PROFESSIONALS (Architect, Civil Engineer, Electrical Engineer, M...
06/07/2026

WE BUILD AND DESIGN

FOR YOUR PLANS AND DESIGNS
GET DESIGN PROFESSIONALS (Architect, Civil Engineer, Electrical Engineer, Master Plumber, Mechanical Engineer, Interior Designer, Etc.)

Are you planning to build your dream house, commercial building, renovation and other.

Contact us now at 09702791243 or message us on our FB Page
Email: [email protected]

We Offer Complete set of plans signed and sealed for building permit, occupancy permit and house loan requirements๐Ÿฅฐ

โ˜‘๏ธ๐€๐ซ๐œ๐ก๐ข๐ญ๐ž๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Schematic Floor Plans
-Exterior 3d Models
- Exterior Perspective
-Architectural Floor Plans
-Elevations and Sections
-Reflected Ceiling and Lighting Plan
-Schedule of Doors and Windows
-Signed and Sealed by registered & Licensed Architect

โ˜‘๏ธ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Foundation and Floor framing Plans
-Roof Framing Plans and Details
-Schedule and Details of Footing, Columns and Beams
-Structural Design Analysis
-Signed and Sealed by Registered & Licensed Civil/Structural Engineer

โ˜‘๏ธ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Electrical Lighting Plan
-Electrical Power Plan
-Schedule of Loads, Electrical Notes and Symbols
-Signed and Sealed by Registered &
Licensed Professional Electrical Engineer

โ˜‘๏ธ๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  ๐๐ฅ๐š๐ง๐ฌ
-Water Supply Plan
-Storm and Surface Drain Plan
-Isometric Layout, Plumbing Details, Notes and Symbols
-Signed and Sealed by Registered & Licensed Master Plumber

โ˜‘๏ธ๐๐ฅ๐ฎ๐ž๐ฉ๐ซ๐ข๐ง๐ญ๐ฌ
5 sets A1 Size
Signed and Sealed by the Architect and Engineers

โ˜‘๏ธ๐’๐ฉ๐ž๐œ๐ข๐Ÿ๐ข๐œ๐š๐ญ๐ข๐จ๐ง๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ข๐ฅ๐ฅ ๐จ๐Ÿ ๐Œ๐š๐ญ๐ž๐ซ๐ข๐š๐ฅ๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐ž๐ซ๐ฆ๐ข๐ญ ๐…๐จ๐ซ๐ฆ๐ฌ
Signed and Sealed by the Architect and Engineers

Two Storey Apartment Building with 6roomsSecond floor slab preparation in progress ๐Ÿ—Where proper framing and metal decki...
06/07/2026

Two Storey Apartment Building with 6rooms

Second floor slab preparation in progress ๐Ÿ—
Where proper framing and metal decking set the foundation for strength and safety.

โœจ Build your vision into reality
๐Ÿ’ฌ Message us today and letโ€™s start planning your future home!
---
๐Ÿ  Services We Offer:
๐Ÿ“ Custom Home Design
๐Ÿ— Construction & Building
๐Ÿ”จ Renovation & Remodeling
๐ŸŽจ Interior Design
๐Ÿข Commercial Construction
๐Ÿ‘ทโ€โ™‚๏ธ General Contracting
โž• Home Additions
---
โ€ผ๏ธ FREE OCULAR INSPECTION ๐Ÿ“Œ
โœจ Build your vision into reality
๐Ÿ— Letโ€™s Build Homeyyy ๐Ÿค™
๐Ÿ“ฒ Follow & Connect:
โœ‰๏ธ [email protected]
๐Ÿค™ 09702791243

๐Ÿ’ฏ๐Ÿค
16/06/2026

๐Ÿ’ฏ๐Ÿค

โ‚ฑ12,000/sqm House Is Gone โ€” Here's What It Actually Costs to Build in 2026

The client sits across from you with a printed spreadsheet. Budget: โ‚ฑ1,200,000. Project: 100 sq.m. bungalow, two bedrooms, decent finishes. Turnover in ten months.

You've seen this before.

You take a breath.

That Budget Was Built in 2009

In 2009, โ‚ฑ12,000 per square meter was a workable number. A complete 100 sq.m. bungalow โ€” poured concrete, tiled floors, painted walls, basic fixtures, livable. Mid-range finishes. Move-in ready.

That same budget in 2026? You're not even halfway through the shell.

Rough concrete structure. Basic plumbing rough-in. Structural steel. No tiles. No doors. No ceiling. No electrical finishing. The bones of a house โ€” not a house.

That's not a contractor being greedy. That's cement, steel, and labor pricing telling the truth that your client's spreadsheet isn't.

What Actually Happened to the Numbers

Here's the short version of a very long headache.

Post-pandemic, material costs didn't settle. They climbed โ€” and kept climbing. Fuel surged 13.6% year-on-year as of April 2026. Steel quotations started rising again in early 2026 following Middle East tensions and shipping disruptions. The supply chain that everyone said would "normalize" has a different definition of normal now.

Meanwhile, TESDA-certified skilled labor is harder to find, and the people who are licensed and trained are commanding higher daily rates โ€” because demand is up and supply is walking off to Qatar, New Zealand, and Canada.

The Philippine construction market grew 9.4% in 2024. More projects, same shrinking labor pool, higher input costs.

You do the math.

This isn't inflation as an abstract concept. This is the price of a bag of Portland cement on the morning you need to pour a column.

What โ‚ฑ1.2 Million Actually Buys in 2026

Let's put real line items on it, because contractors trust numbers.

A 100 sq.m. bungalow at 2026 pricing โ€” conservative estimates based on current project data:

- **Structural works and formworks:** โ‚ฑ800,000โ€“โ‚ฑ900,000
- **Concrete and masonry (walls, slab):** โ‚ฑ400,000โ€“โ‚ฑ500,000
- **Basic plumbing rough-in:** โ‚ฑ300,000
- **Structural steel (roof framing, beams):** โ‚ฑ500,000
- **Mobilization, permits, and professional fees:** โ‚ฑ400,000

You're already at โ‚ฑ2.4 million to โ‚ฑ2.6 million โ€” and you haven't touched electrical, roofing finish, doors, windows, tiles, painting, or fixtures.

That's the shell. That's it.

A finished, livable 100 sq.m. home in 2026 starts at โ‚ฑ3.6 million. That's the floor, not the ceiling. Premium finishes, difficult site access, or any design complexity pushes that number higher fast.

The โ‚ฑ1.2 million budget isn't a starting point anymore. It's not even half the shell.

The Conversation Most Contractors Avoid

Here's where contractors lose money before they even break ground.

The client comes in with a 2019 reference point โ€” a cousin's house, a neighbor's renovation, a Facebook post from six years ago. They're not lying. They genuinely believe that number is the current market.

And instead of correcting them clearly, some contractors absorb the gap. They cut the contingency. They squeeze the labor rate. They bid to win instead of bid to deliver.

By week six, the steel is on site, the progress billing is still pending, and the contractor is funding the project out of his own pocket. That's where most residential contractors bleed out. Not from a bad project โ€” from a good project with a bad budget conversation at the start.

How to Have This Conversation Without Losing the Client

This is the part they don't teach in engineering school.

You're not delivering bad news. You're delivering accurate information โ€” which is your job. A contractor who agrees to an impossible budget isn't being kind. He's setting up a project that ends badly for everyone, including himself.

Frame it this way:

"Yung budget nyo is actually a strong starting point โ€” for the structural phase. Let's talk about what you're building in stages, so nothing gets compromised and you don't run out of budget before the roof is on."

Phased construction isn't a consolation prize. For a lot of Filipino homeowners, it's actually the smarter path โ€” build the shell strong, finish the interiors as budget allows. A structurally sound shell that sits waiting for finishes beats a rushed, under-budgeted build that develops cracks before the paint dries.

Add a minimum 20% contingency to every quote you present. Not as a cushion for your mistakes โ€” as a buffer against material price spikes that are now a predictable feature of 2026 construction, not an exception. Tell the client directly: *"Material costs moved three times on my last project. This buffer protects you, not me."*

The Reframe

The client with the โ‚ฑ1.2 million budget isn't your problem.

The client with the โ‚ฑ1.2 million budget who doesn't know what โ‚ฑ1.2 million buys โ€” that's the conversation you need to lead.

Contractors who have this talk early, honestly, and with real numbers build the kind of client trust that turns into referrals. Contractors who avoid it spend the back half of the project explaining why they're behind, over budget, and why they need a variation order โ€” a formal contract amendment to cover costs beyond the original scope.

The budget conversation is part of the job.

Have it first.

One takeaway: Before any project starts, walk your client through a line-item breakdown of what their budget actually covers in 2026 prices โ€” not what it should cover, not what it used to cover. That one conversation protects your margin, your relationship, and your reputation.

> *Cost estimates are based on 2026 market conditions and actual project data. Figures vary by location, specifications, and site conditions.*

PROPOSED TO OUR CLIENT7 STOREY COMMERCIAL BUILDINGLOCATION: DAVAO CITYWE BUILD AND DESIGNFOR YOUR PLANS AND DESIGNSGET D...
07/05/2026

PROPOSED TO OUR CLIENT
7 STOREY COMMERCIAL BUILDING
LOCATION: DAVAO CITY

WE BUILD AND DESIGN

FOR YOUR PLANS AND DESIGNS
GET DESIGN PROFESSIONALS (Architect, Civil Engineer, Electrical Engineer, Master Plumber, Mechanical Engineer, Interior Designer, Etc.)

Are you planning to build your dream house, commercial building, renovation and other.

Contact us now at 09702791243 or message us on our FB Page
Email: [email protected]

We Offer Complete set of plans signed and sealed for building permit, occupancy permit and house loan requirements๐Ÿฅฐ

โ˜‘๏ธ๐€๐ซ๐œ๐ก๐ข๐ญ๐ž๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Schematic Floor Plans
-Exterior 3d Models
- Exterior Perspective
-Architectural Floor Plans
-Elevations and Sections
-Reflected Ceiling and Lighting Plan
-Schedule of Doors and Windows
-Signed and Sealed by registered & Licensed Architect

โ˜‘๏ธ๐’๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Foundation and Floor framing Plans
-Roof Framing Plans and Details
-Schedule and Details of Footing, Columns and Beams
-Structural Design Analysis
-Signed and Sealed by Registered & Licensed Civil/Structural Engineer

โ˜‘๏ธ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐๐ฅ๐š๐ง๐ฌ
-Electrical Lighting Plan
-Electrical Power Plan
-Schedule of Loads, Electrical Notes and Symbols
-Signed and Sealed by Registered &
Licensed Professional Electrical Engineer

โ˜‘๏ธ๐๐ฅ๐ฎ๐ฆ๐›๐ข๐ง๐  ๐๐ฅ๐š๐ง๐ฌ
-Water Supply Plan
-Storm and Surface Drain Plan
-Isometric Layout, Plumbing Details, Notes and Symbols
-Signed and Sealed by Registered & Licensed Master Plumber

โ˜‘๏ธ๐๐ฅ๐ฎ๐ž๐ฉ๐ซ๐ข๐ง๐ญ๐ฌ
5 sets A1 Size
Signed and Sealed by the Architect and Engineers

โ˜‘๏ธ๐’๐ฉ๐ž๐œ๐ข๐Ÿ๐ข๐œ๐š๐ญ๐ข๐จ๐ง๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ข๐ฅ๐ฅ ๐จ๐Ÿ ๐Œ๐š๐ญ๐ž๐ซ๐ข๐š๐ฅ๐ฌ
Signed and Sealed by the Architect/Engineers

โ˜‘๏ธ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐๐ž๐ซ๐ฆ๐ข๐ญ ๐…๐จ๐ซ๐ฆ๐ฌ
Signed and Sealed by the Architect and Engineers

Starting construction without permit? Isang maling Desisyon langโ€”pwede mong doblehin ang gastos.Maraming nagpapagawa ng ...
06/05/2026

Starting construction without permit? Isang maling Desisyon langโ€”pwede mong doblehin ang gastos.

Maraming nagpapagawa ng bahay ang nagsisimula agad kahit walang permit.
๐Ÿ‘‰ Kasi gusto makatipid, mapabilis, o โ€œginagawa naman ng iba.โ€

Pero real talkโ€ฆ
Ang bahay na walang permitโ€ฆ pwedeng ipahinto kahit kalagitnaan na.

Hereโ€™s a simple step-by-step guide para maintindihan mo kung ano mangyayari at paano ka makakaiwas ๐Ÿ‘‡

1๏ธโƒฃ Nagsimula ka nang walang permit
Sa umpisa, parang okay lang.
โœ”๏ธ Tuloy ang construction
โœ”๏ธ Walang papel, walang pila
โœ”๏ธ Mabilis ang progress
๐Ÿ’ฌ Feeling mo:
โ€œSayang kasi oras sa permitโ€ฆโ€

โ€”โ€”โ€”โ€”
2๏ธโƒฃ May makakapansin (kapitbahay, barangay, LGU) ๐Ÿ‘€
Hindi maiiwasanโ€”may magrereport o mapapadaan na inspector.
๐Ÿ’ฌ โ€œMay ginagawa dito, may permit ba?โ€

โ€”โ€”โ€”โ€”
3๏ธโƒฃ Bibisitahin ka ng inspector ๐Ÿข
Magche-check sila ng documents.
โŒ Kapag wala kang maipakita, automatic violation ka.

โ€”โ€”โ€”โ€”
4๏ธโƒฃ Issuance ng Notice of Violation ๐Ÿ“„
Makakatanggap ka ng formal notice mula sa LGU.
๐Ÿ’ฌ Required kang mag-explain o mag-comply agad.

โ€”โ€”โ€”โ€”
5๏ธโƒฃ Stop Work Order (SWO) ๐Ÿ›‘
Ito na ang pinaka-critical.
โŒ Ihihinto ang construction kahit kalagitnaan pa.
๐Ÿ’ฌ Sayang ang labor at materials na naka-standby.

โ€”โ€”โ€”โ€”
6๏ธโƒฃ Penalties at fines ๐Ÿ’ธ
May babayaran kang multa depende sa laki ng project.
โŒ Mas mahal pa kaysa permit fee sana.

โ€”โ€”โ€”โ€”
7๏ธโƒฃ Kailangan mong mag-apply ng permit (late) ๐Ÿ“
Dadaan ka pa rin sa tamang proseso.
โŒ Mas strict na ang evaluation dahil may violation ka na.

โ€”โ€”โ€”โ€”
8๏ธโƒฃ Possible na ipabago ang structure ๐Ÿ—๏ธ
Kung hindi compliant ang nagawa mo:
โŒ Ire-revise ang design
โŒ May ipapabaklas o babaguhin

โ€”โ€”โ€”โ€”
9๏ธโƒฃ Worst case: demolition ๐Ÿšง
Kung sobrang non-compliant:
โŒ Pwedeng ipademolish ang part o buong structure

โ€”โ€”โ€”โ€”
๐Ÿ”Ÿ Delayed ang pangarap mo โณ
Imbes na matapos agad:
โŒ Na-delay na
โŒ Nadoble pa ang gastos
๐Ÿ’ฌ โ€œKung nag-permit lang sana akoโ€ฆโ€

โ€”โ€”โ€”โ€”

๐Ÿ’ก Simple Tips para makaiwas

โœ”๏ธ Mag-secure ng building permit bago magsimula ๐Ÿ“
โœ”๏ธ Kumonsulta sa engineer/architect ๐Ÿ‘ทโ€โ™‚๏ธ
โœ”๏ธ I-check ang requirements sa inyong LGU ๐Ÿข
โœ”๏ธ Isama sa budget ang legal fees ๐Ÿ’ฐ
โœ”๏ธ Huwag magpadala sa โ€œginagawa ng ibaโ€ ๐Ÿšซ

โ€”โ€”โ€”โ€”

โœจ Real talk:
Ang permit hindi pahirapโ€”proteksyon ito sa pera, oras, at pangarap mo.

ConstructionTips

Address

PUROK STO. NIร‘O , BRGY. SARAVIA (BO. 8) , KORONADAL CITY, SOUTH COTABATO (9506)
Koronadal
9506

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Saturday 7am - 5pm
Sunday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Abas Construction Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share