CJLI Engineering Solutions

CJLI Engineering Solutions MEPF
SOLAR DESIGN AND BUILD
AGGREGATES SUPPLY
CHB
TRUCK RENTALS

🚨 Safety First! Understanding Your Fire Detection and Alarm System (FDAS) 🚨​When every second counts in an emergency, ha...
31/07/2026

🚨 Safety First! Understanding Your Fire Detection and Alarm System (FDAS) 🚨
​When every second counts in an emergency, having a fully functional and properly installed FDAS isn't just a requirement—it's a lifesaver!
​Take a look at this newly completed installation. Here is why each key component mounted on this pillar plays a vital role in building safety:
​🚨 1. Manual Call Point (Pull Station)
​The First Line of Human Defense: Located at a convenient height, this allows anyone who spots smoke or fire to trigger the building-wide alarm manually before automated sensors might detect it.
​🔴 2. Strobe / Sounder (Visual Indicator)
​Clear Visual Alert: Situated right in the middle, this flashing light ensures that even in noisy environments—or for individuals with hearing impairments—the emergency alert is instantly seen.
​🔔 3. Fire Alarm Bell
​Audible Warning: Mounted at the top to project sound effectively, this loud bell ensures everyone in the immediate vicinity is instantly notified to evacuate safely.
​🛠️ Why Professional FDAS Installation Matters:
​✅ Immediate Notification: Quick alerts save lives and minimize property damage.
​✅ Code Compliance: Meets local fire safety codes and building standards.
​✅ Clean & Durable Piping: Expertly piped and wired for reliable performance when you need it most.
​Ensure your establishment is fully compliant and fire-safe! Contact us today for reliable FDAS installations, maintenance, and testing. ⚡⚙️
​

4" Mechanical TEE(Ductice Iron)A permanent approach to replace a broken PVC TEE (No need curing time)
29/07/2026

4" Mechanical TEE(Ductice Iron)
A permanent approach to replace a broken PVC TEE (No need curing time)

28/07/2026

MCIA Terminal 1 Haul Out of Debris from leak repair excavation.

25/07/2026
FDAS Works
22/07/2026

FDAS Works

On-going Siemens FDAS Installation at MSG Building at MEZ 2 Estate
18/07/2026

On-going Siemens FDAS Installation at MSG Building at MEZ 2 Estate

14/07/2026

Civil and Plumbing Works

24 KW PV PanelRoof Deck MountedInverter Upgrade from 18KW 1Phase  to 20KW 3Phase
17/06/2026

24 KW PV Panel
Roof Deck Mounted
Inverter Upgrade from 18KW 1Phase to 20KW 3Phase



ONGOING HYBRID SYSTEM  INSTALLATION18KW HYBRID DEYE INVERTER24KW PANEL45KW-HOUR STORAGE BATTERY ゚
14/05/2026

ONGOING HYBRID SYSTEM INSTALLATION
18KW HYBRID DEYE INVERTER
24KW PANEL
45KW-HOUR STORAGE BATTERY

゚


Address

Pit-os Cebu City
Cebu City
6000

Telephone

+639176359962

Website

Alerts

Be the first to know and let us send you an email when CJLI Engineering Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CJLI Engineering Solutions:

Shortcuts

Share