28/09/2026
Site visit done! ✅
Before the actual build, we make sure everything is aligned first, from actual site measurements and site conditions, to sample presentation, material approval, and raising clarifications with the client.
Why is this important? Because proper planning before fabrication helps us avoid costly mistakes, minimize revisions, and make sure the final output matches the approved design and actual site requirements.
Step by step. Measure, clarify, approve, then fabricate. 👌
Next up: fabrication of the glass wall systems and glass doors! ✨