13/10/2026
Next job is underway: approximately 140 m² of driveway, shaped to suit the owners and their six vehicles—including one very low car.
We’ve spread 20 tonnes of metal to bring the base prep up to height and create the best possible driveway shape.
The plan is to pour early next week, once the bad weather clears. It’ll have a light broom finish for grip, with 5 kg of black oxide.
We’re also getting the vehicle crossing prepped, inspected and poured as part of the job.
The phone’s been ringing, with quotes coming in and going out. If you’re looking to get a job booked in before Christmas or for the New Year, now’s a good time to get in touch.