27/09/2026
Awesome finish on a very difficult access wall.
Big thanks to Ryan and his Team at Bay Civil and Drainage for getting the 1.6t excavator in together.
25 linear meters
1.45m high
5.5 m3 concrete
Drainage in and capped ready for pool fencing.