MGF Contracting Ltd

Call Directions Contact the business

MGF Contracting Ltd Hi, I’m Matt. I’m a contractor operator with over 15 years of experience. If you’re looking for a dependable contractor operator, please get in touch

I offer a range of services, including demolition, drainage, final trim, sheet piling & bulk excuvation.

New project on the go.  This one with views.   Some rock moving then sheetpile a pit and de water  for work do be done o...
02/07/2026

New project on the go. This one with views. Some rock moving then sheetpile a pit and de water for work do be done on a blocked storm water in sumner. Just geting set up

Possibly looking for work still currently with client and have been 2 and a half years consistent but with any contracti...
11/06/2026

Possibly looking for work still currently with client and have been 2 and a half years consistent but with any contracting there is quite patches ect. May be available if someone wants roughly 3 months work or more. 1.7 ton to 140 ton. Most machines mainly diggers. Deep Drainage,sheetpilling,demo residential and commercial bulking,final trim,hill work ect. Please message or call. Happy to any sort of work and discuss rates. Cheers!

Few random pics of my ol digger dog  ruru who would sit with me all day or she would follow me around an sleep in the gr...
15/04/2026

Few random pics of my ol digger dog ruru who would sit with me all day or she would follow me around an sleep in the grass. Plus some of our last line in flockton. Harrison st. Almost at the end but not quite.. unfortunately really just the same old stuff. Shield digging laying 6m 600 pks. With abit of sheetpilling around services.

Well thats about a wrap for 3rd year on my own Contracting.  Been flat out from the start wich has been good.  Not to mu...
15/12/2025

Well thats about a wrap for 3rd year on my own Contracting. Been flat out from the start wich has been good. Not to much interesting to show on this line as pretty basic dig an lay in shields. But making good progress. Cheers again to everyone who supports me and big thanks to march who have supplied me alot of work. The ol Volvo is just shy of 1500 hrs now and I got it at 200. 1300 hours mostly by my self keeping it s**c an span with a few minor grazes along the way is the only way i know an was braught up to look after gear. really nice machine with 0 issues. Have a good break everyone. Cheers to 2025.

We throw back to when I was 17 and got to go on Goliath. Verry lucky I had the chance so young. But got it done.  Starte...
08/11/2025

We throw back to when I was 17 and got to go on Goliath. Verry lucky I had the chance so young. But got it done. Started at 13 story's if I remember correctly. 140ton 40mtr reach.

Started on the main line flockton st. Got the Volvo back an got her gleaming.  First man hole in an laying a 600 pks pip...
17/10/2025

Started on the main line flockton st. Got the Volvo back an got her gleaming. First man hole in an laying a 600 pks pipe. Hopefully lay first full pipe monday. Still getting plenty of kids to sit in the digger an make dreams come true. I've now put 1000hrs on this machine. Got my two girls on the digger an truck rides. Just how I was brung up at this company. Also yes a flamingo strapped to the boom. Cheers jack 😅

Good to get some nice feedback.  An teaching kids about diggers and letting them sit on them.
19/08/2025

Good to get some nice feedback. An teaching kids about diggers and letting them sit on them.

My we employe.  Having a day out.  Plus upgraded from the hilux. Ft  jmc contracting.
15/07/2025

My we employe. Having a day out. Plus upgraded from the hilux. Ft jmc contracting.

Finished England street.  Setting few more mile stones for my self.  100 sheetpile out in a day. Hit 1000hrs in the volv...
25/06/2025

Finished England street. Setting few more mile stones for my self. 100 sheetpile out in a day. Hit 1000hrs in the volvo an she's still looking like new. But now onto the next big project ! This one is 3 streets to do. Flat out wich is awsome. Got the 225 for this one. Plenty of power lines to work under an useing shields an no sheetpile

Another busy start to the year.  Sorry for not posting.  Currently on a project laying 225 pvc sewer at 4.5mtrs deep.  D...
21/04/2025

Another busy start to the year. Sorry for not posting. Currently on a project laying 225 pvc sewer at 4.5mtrs deep. Dealing with sand has made some challenges but we're geting through it. Plenty of sheetpile and de watering. Have 120mtrs to lay. Sitting on swamp mats.

Address

Christchurch

Telephone

+64272384144

Website

Alerts

Be the first to know and let us send you an email when MGF Contracting Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MGF Contracting Ltd:

Shortcuts

Share

Category