Pumped up Plumbing

Call Directions Website Contact the business

Pumped up Plumbing Residential and commercial plumbing, drainage and gas fitting

Project: Gulf Harbour Heat PumpWe recently replaced an ageing gas infinity unit with a more energy efficient Rinnai Envi...
21/10/2026

Project: Gulf Harbour Heat Pump

We recently replaced an ageing gas infinity unit with a more energy efficient Rinnai Enviroflo heat pump hot water cylinder, compatible with the client’s new solar panel system.

The job involved removing an existing palm tree and pouring a level concrete pad on the sloping ground to accommodate the new unit.

The upgrade will help the client work towards her goal of reducing energy bills and improving long-term reliability.

Project: Westmere DrainageStage one drainage for this project is complete. We have run sewer lines and connected into th...
19/10/2026

Project: Westmere Drainage

Stage one drainage for this project is complete. We have run sewer lines and connected into the main line, as well as pre running required stormwater lines before the frames go up. This was another challenging access site, with incredibly tight access down each side of the building. Here are some snippets of the overall site progress. Stage two will be completed once the building is up.

Project: Tiny Home ProjectsWe’ve recently completed a few tiny homes for the team at Zelo by Ashcroft Homes . These are ...
08/10/2026

Project: Tiny Home Projects

We’ve recently completed a few tiny homes for the team at Zelo by Ashcroft Homes . These are a great size and come in several different variations and layouts. We’ve completed the internal plumbing in the factory, so that they are ready to connect once delivered to site. These particular ones have been staged as show homes. We’re onto the next builds now, watch this space!

Project: Sunnynook Drainage WorksThis client was experiencing quite a few stormwater issues on these two properties. We ...
30/09/2026

Project: Sunnynook Drainage Works

This client was experiencing quite a few stormwater issues on these two properties. We made a few changes and upgrades including installing new cesspits in run off locations, and installing a new 100mm stormwater line to help divert water away. This site was particularly challenging with a steep narrow driveway, meaning excavator and truck access planning was crucial with spoil and metal. The builders then finished off with a new concrete driveway. Swipe through to see the process.

Project: Bayswater New BuildA finished look inside one of our latest new build projects in Bayswater for the team at Ash...
28/09/2026

Project: Bayswater New Build

A finished look inside one of our latest new build projects in Bayswater for the team at Ashcroft Homes . We handled the full plumbing and drainage scope for this one, including under slab works, internal pipe out and fit off.

Project: Weiti Boating Club Pump WorksWe recently helped tidy up the pump setup for our local boating club. We re-ran th...
24/09/2026

Project: Weiti Boating Club Pump Works

We recently helped tidy up the pump setup for our local boating club. We re-ran the pipework to be able to install it in a new pump housing elevated off the ground, to protect it from the elements. While we were at it, we also installed a new filter system as a little upgrade.

Project: Fast Food Restaurant Gas WorksTo allow for the cladding replacement on this building, we had to plan a quick tu...
22/09/2026

Project: Fast Food Restaurant Gas Works

To allow for the cladding replacement on this building, we had to plan a quick turnaround to ensure the restaurant could remain open. Our team disconnected the existing Rinnai infinity units and removed the old, corroded copper pipework. They bent up new pipework and fittings to suit while the new cladding was being installed. Once ready, the units were reinstalled, tested and livened up again.

Project: New Lynn - Three Residential UnitsWe have officially finished the final plumbing fit-out for this three house d...
02/09/2026

Project: New Lynn - Three Residential Units

We have officially finished the final plumbing fit-out for this three house development. This project required precision at every stage, and the team worked tirelessly to ensure a smooth run at every step. We loved working on this from all of the initial underground drainage and under slab work, right through to installing the water tanks, pumps, and these bathroom and kitchen fixtures. It’s always rewarding to see a full-scope project come together!

Project: Parnell Bathroom RenovationThe final look at our bathroom renovation project in Parnell. The client chose high ...
26/08/2026

Project: Parnell Bathroom Renovation

The final look at our bathroom renovation project in Parnell. The client chose high end items and finishes, which work beautifully in this space. We love the clean minimal look. Key features include a back-to-wall bathtub, matching in-wall cistern toilet, a floating fluted vanity, and brushed metal hardware.

hofmann_construction



Project: Kumeu Fire StationA neat two bathroom upgrade for the Kumeu Fire Station working for the team Shift Group Ltd T...
24/08/2026

Project: Kumeu Fire Station

A neat two bathroom upgrade for the Kumeu Fire Station working for the team Shift Group Ltd This one was a standard 3 piece bathroom upgrade, bringing it up to standard and spec with other stations.

Address

Auckland

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+64272003855

Alerts

Be the first to know and let us send you an email when Pumped up Plumbing posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pumped up Plumbing:

Shortcuts

Sponsored

Share