08/06/2026
What does it take to bring three remote Fijian island resorts onto solar plus battery?
For Future Energy, it took two years, five 40 foot containers, 2,000 solar panels, 1.6 MW of SolaX Power Australia battery storage, and eight Fijian electricians trained end to end.
The result: 50% reduction in energy costs projected for year one. Payback in 2 to 3 years from operational savings alone. The maths now works for any commercial site with high or rising energy bills.
Watch the full story: https://www.future-energy.co.nz/project/yasawa-islands-solar/?utm_source=Social&utm_medium=Meta&utm_campaign=Yasawa