07/10/2026
Before a new city district can rise, the ground underneath it has to be ready.
In Hamburg we are part of the Elbinselquartier development, where an area is being turned into a new piece of the city. Our team is installing around 632,000 metres of vertical drainage to prepare the subsoil for everything that comes on top of it.
Vertical drains give the water in soft ground a way out. That way the ground settles now, in a controlled way, instead of years after the first buildings are standing.
We are installing the vertical drainage for Eggers Umwelttechnik GmbH, part of the Eggers Gruppe. Good to be part of a development of this size.
Building on ground that first needs preparing? Take a look at wicks.nl