02/10/2026
With the site profiling complete, our team moved straight into the foundation pit excavation for the 2 x 40k bbl Tank Project in Ogini Oil Field.
Our civil crew dug out the foundation pits strictly to design depth and dimensions. Getting pit depth, soil stability, and exact bottom levelling at this stage is essential to support the upcoming structural loads.
Every step below ground sets up strength above ground.