Sequoia Asphalt Contractors Limited

Directions

Sequoia Asphalt Contractors Limited It has also significantly contributed to the economic development of the country.

The company’s Asphalt Plant at Ibafo, Ogun State is a state-of-the-earth equipment used to produce quality asphalt for infrastructural and development projects.

Tack Coat vs Prime CoatPrime Coat: Applied on a prepared granular base before the first bituminous layer. It penetrates ...
03/10/2026

Tack Coat vs Prime Coat

Prime Coat: Applied on a prepared granular base before the first bituminous layer. It penetrates the surface, binds loose particles, reduces dust, and improves adhesion.

Tack Coat: Applied between an existing bituminous or concrete surface and a new bituminous layer. Its main purpose is to create a strong bond between the two layers.

Key Difference:
Prime Coat = Base β†’ First bituminous layer
Tack Coat = Existing pavement β†’ New bituminous layer

Asphalt Road Cross section, Road Construction 🚧
03/10/2026

Asphalt Road Cross section, Road Construction 🚧

Road Cross section layers πŸ‘ŒπŸš§
23/07/2026

Road Cross section layers πŸ‘ŒπŸš§

πŸ‘·πŸΎβ€β™‚οΈπŸ‘·πŸΏβ€β™‚οΈπŸ‘·
20/07/2026

πŸ‘·πŸΎβ€β™‚οΈπŸ‘·πŸΏβ€β™‚οΈπŸ‘·

πŸ‘·πŸ‘·πŸΏβ€β™‚οΈπŸ‘·πŸΎβ€β™‚οΈ
20/07/2026

πŸ‘·πŸ‘·πŸΏβ€β™‚οΈπŸ‘·πŸΎβ€β™‚οΈ

πŸ‘·πŸ»πŸ‘·πŸ»πŸ‘·πŸΏπŸ‘·πŸΏβ€β™‚οΈ
15/04/2026

πŸ‘·πŸ»πŸ‘·πŸ»πŸ‘·πŸΏπŸ‘·πŸΏβ€β™‚οΈ

Address

KM15 LAGOS IBADAN Expressway IBAFO
Ibafo
110115

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 17:00

Website

Alerts

Be the first to know and let us send you an email when Sequoia Asphalt Contractors Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share