India's housing demand doesn't wait. Neither does MFE. ๐๏ธ
High-rise construction in India moves fast and the pressure to deliver units at scale is only growing. Floor cycle times are one of the most critical focus points for developers, and MFE's monolithic formwork system is exactly designed around that.
On our current India projects, we're averaging 9-day floor cycles. With monolithic casting of walls and slabs completed in a single pour, and formwork panels designed for 150+ reuses, the system is purpose-built for the repetitive shear wall structures that define high-rise residential towers. The more floors you build, the more efficient it gets.
Compared to conventional methods, overall project timelines can be reduced by up to 50%. For developers managing multiple towers or township-scale developments, that is no small difference.