22/08/2026
When almost everyone took a summer break, we were busier than ever, installing this 2500amp factory main panel.
* Installations of supply cables from Enemalta 300mm2.
* Installations of all circuits cables from 240mm2 to 6mm2.
* Remove and test all cables from the old panel.
* Professional lug crimping
Thanks to all involved:
* Our clients for the trust.
* ESS - Electrical Supplies & Services for supplying all materials and panel building.
* KSC Engineering for testing and certification of our work.
* D installations helping put cables in place
* And to all K Electric team.