22/08/2026
Making alterations in a finished apartment is never easy, but safety and standards should never be compromised. Designer drawings look great on screen, but bridging the gap between digital plans and site practicality requires hands-on problem solving.
The plumbing modifications are already complete, and we are moving steadily into the next phase.
Next Steps:
Distribution board (DB) upgrade
Finalizing piping and conduit wiring
Comprehensive electrical testing and inspection
On to the next stage to ensure everything is done safely, cleanly, and strictly up to standard!!⚡⚙️