🚧 HJ FACTORY PROJECT – FIRE PROTECTION SYSTEM 🚧Xayanunt Electric team successfully delivered fire protection system mate...
25/05/2026

🚧 HJ FACTORY PROJECT – FIRE PROTECTION SYSTEM 🚧
Xayanunt Electric team successfully delivered fire protection system materials to site and continued night operation support to keep the project moving on schedule.
Despite difficult site conditions and late-night unloading activities, our team remained focused on safety, coordination, and efficient ex*****on.
✅ Material delivery completed
✅ Crane operation & unloading support
✅ Site coordination during nighttime work
✅ Preparation for fire protection system installation
Strong teamwork and proper planning help ensure smooth project progress and reliable system installation for the HJ Factory Project.

⚡️ MEGAMALL KOKOK PROJECT UPDATE ⚡️Fire Alarm System Testing & Commissioning in progress by Xayanunt Electric Team.Our e...
24/05/2026

⚡️ MEGAMALL KOKOK PROJECT UPDATE ⚡️
Fire Alarm System Testing & Commissioning in progress by Xayanunt Electric Team.
Our engineering team is currently performing: • Siemens Fire Alarm Panel testing
• Device loop checking & troubleshooting
• System programming and verification
• Smoke detector & notification testing
• Final commissioning preparation
Every testing step is focused on: ✅ Safety
✅ Reliability
✅ Fast response
✅ System stability before handover
Professional installation and testing are key to ensuring the building protection system operates correctly during emergency situations.
“Power must be stable — Systems must be reliable.”
📍 Megamall Kokok Project
👷 Xayanunt Electric Sole Co., Ltd.

⚡ Weekly Activity Check – VietinBank BuildingXayanunt Electric maintenance team conducted routine preventive maintenance...
23/05/2026

⚡ Weekly Activity Check – VietinBank Building
Xayanunt Electric maintenance team conducted routine preventive maintenance and inspection services to ensure stable and reliable building systems operation.
Scope of work included: • Air conditioning system inspection & cleaning
• Ceiling and facility maintenance support
• Fire pump system checking and maintenance
• Equipment inspection and performance recording
• Preventive maintenance activities for building systems
Our team focuses on: ✅ Safety
✅ Reliability
✅ System Stability
✅ Preventive Maintenance Standard
“Reliable Power & Trusted Systems”
xayanuntelectric.la⁠�

⚡️ CM Factory Project – Working Progress Update ⚡️Xayanunt Electric team is continuing the electrical installation and i...
21/05/2026

⚡️ CM Factory Project – Working Progress Update ⚡️
Xayanunt Electric team is continuing the electrical installation and infrastructure works for the CM Factory Project.
Current progress includes: • Main electrical panel installation
• Underground conduit and power cable routing
• Steel structure electrical support works
• Wall cutting and conduit preparation
• Outdoor panel mounting and cable protection system
• Site coordination and installation adjustment according to construction progress
Our team continues to focus on: ✅ Safety First
✅ Quality Installation
✅ Clean Workmanship
✅ On-time Progress
“Power must be stable — Systems must be reliable.”
— Xayanunt Electric Sole Co., Ltd.

⚡️ HJ FACTORY PROJECTWorking Progress UpdateXayanunt Electric team continues site ex*****on and coordination for undergr...
19/05/2026

⚡️ HJ FACTORY PROJECT
Working Progress Update
Xayanunt Electric team continues site ex*****on and coordination for underground utility and drainage system installation at HJ Factory Project.
Current activities: • Storm drainage concrete pipe installation
• Underground piping & utility routing
• Site measurement and level checking
• Team coordination with site engineer
• Preparation for next construction phase
• Quality and safety inspection on site
Our team focuses on: ✅ Safety First
✅ Engineering Standard
✅ Quality Installation
✅ On-Time Progress
“Reliable System Starts From Strong Foundation.”









⚡ HJ FACTORY PROJECT – WORKING PROGRESS UPDATE ⚡Xayanunt Electric team is continuing the grounding & earthing system ins...
16/05/2026

⚡ HJ FACTORY PROJECT – WORKING PROGRESS UPDATE ⚡
Xayanunt Electric team is continuing the grounding & earthing system installation works at HJ Factory Project.
✅ Grounding trench excavation
✅ Copper grounding conductor installation
✅ Earth rod driving works
✅ Earth resistance testing completed
✅ Measured grounding resistance: 3.44 Ω
Our team focuses on safety, quality, and reliable electrical protection systems to ensure long-term operational stability for the factory.
Thank you to our team and partners for the continuous support and coordination.

⚡ HJ Factory Project – Lightning Protection System Progress ⚡Xayanunt Electric & OmniDirection team continue installatio...
12/05/2026

⚡ HJ Factory Project – Lightning Protection System Progress ⚡
Xayanunt Electric & OmniDirection team continue installation works for the lightning protection and grounding system at HJ Factory Project.
Scope of work: • Installation of grounding copper conductor
• Exothermic welding connection
• Earth pit & grounding network installation
• Underground concrete drainage pipe works
• Ground resistance testing and inspection
Current grounding test result: ✅ Earth Resistance: 3.57 Ω
The team is working with safety, quality control, and engineering standards to ensure reliable protection for the factory electrical system and structure.

🏗️ Parking Building 7 Floor🚨 Fire Alarm System Installation ProgressXayanunt Electric team is continuing the fire alarm ...
10/05/2026

🏗️ Parking Building 7 Floor
🚨 Fire Alarm System Installation Progress
Xayanunt Electric team is continuing the fire alarm system installation work for the 7-floor parking building project.
Current progress includes: • Conduit and support installation
• Fire alarm device positioning
• Cable routing preparation
• Team coordination for multi-floor installation
• Safety-focused work at height operation
Our team remains committed to quality installation, safety standards, and project schedule control for reliable building protection systems.
⚡ Reliable Power. Trusted Systems.
🏢 Xayanunt Electric Sole Co., Ltd.

⚡ Kokok Megamall – Lightning & Electrical Installation Progress ⚡Xayanunt Electric team continues progressing on the lig...
10/05/2026

⚡ Kokok Megamall – Lightning & Electrical Installation Progress ⚡
Xayanunt Electric team continues progressing on the lightning system, cable tray installation, conduit routing, and M&E infrastructure works at Kokok Megamall.
Current works include: • Cable tray & ladder installation
• EMT / conduit routing and support work
• Lighting system installation
• MDB feeder cable arrangement
• HVAC & electrical coordination
• Lightning system infrastructure preparation
• Ceiling exposed industrial-style installation
Every detail matters for safety, reliability, and long-term maintenance quality.
Xayanunt Electric Sole Co., Ltd.
“Power must be stable — Systems must be reliable.”

🚧 HJ Factory Project Update 🚧Storm Drainage RC Pipe Installation ProgressXayanunt Electric team is continuing the underg...
08/05/2026

🚧 HJ Factory Project Update 🚧
Storm Drainage RC Pipe Installation Progress
Xayanunt Electric team is continuing the underground storm drainage system installation at HJ Factory Project for OXC Company.
Scope of work: • RC pipe installation
• Excavation and alignment work
• Concrete support preparation
• Quality and level inspection before backfilling
Our team focuses on safety, quality, and proper drainage flow to support long-term factory infrastructure reliability.
“Reliable System • Reliable Future”
Xayanunt Electric Sole Co., Ltd.

⚡ Kokok Megamall Project – Fire Alarm System Installation Progress 🔥Our team at Xayanunt Electric is moving forward with...
03/05/2026

⚡ Kokok Megamall Project – Fire Alarm System Installation Progress 🔥
Our team at Xayanunt Electric is moving forward with the fire alarm system installation to ensure safety, reliability, and compliance with standards.
✔️ Installation of manual call points (MCP)
✔️ Conduit routing and cable preparation
✔️ Device positioning aligned with site design
✔️ Ongoing coordination with structure & finishing works
Every detail matters — from proper alignment to secure installation — because fire protection is not optional, it’s critical.
💼 Professional ex*****on
🛠️ Skilled team on site
📊 Focus on quality and safety
📍 Kokok Megamall

Address

ໜ່ວຍ 15, ບ້ານ ດົງນາໂຊກ ເໜຶອ
Vientiane

Alerts

Be the first to know and let us send you an email when Xayanunt Electric ບໍລິສັດ ໄຊຍານັນ ການໄຟຟ້າ ຮັບເໝົາຕິດຕັ້ງ ອອກແບບລະບົບໄຟຟ້າ posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Xayanunt Electric ບໍລິສັດ ໄຊຍານັນ ການໄຟຟ້າ ຮັບເໝົາຕິດຕັ້ງ ອອກແບບລະບົບໄຟຟ້າ:

Share