JCM Developers

JCM Developers We pride ourselves on being skilled and experienced in all aspects of underground construction, tunn

Congratulations from   on one year anniversary of  -Banihal and  -Mohar Road  . It was a great experience for us as we o...
31/01/2023

Congratulations from on one year anniversary of -Banihal and -Mohar Road . It was a great experience for us as we overcame many underground challenges and put up a commendable performance to complete the 8.5 and 6.5 km tunnels. We look forward to the professional completion of a few more projects under construction & PMC supervision under JCM Group's belt in J&K as part of the initiative.
https://jcmdevelopers.com/

https://youtu.be/vwj00bKuFz4

16/09/2022

The following manpower is urgently required for the TBM project- TBM Forman, 4G welders, Ring Builder, Segment Erector, Sr. Electrician. Having min. experience of 3 TBM projects.

Need business development manager for my company at Jammu location minimum 3 year experience.
18/07/2022

Need business development manager for my company at Jammu location minimum 3 year experience.

TBM operation for the J&K location requires manpower. Joining on the basis of the interview. Only those applicants will ...
11/07/2022

TBM operation for the J&K location requires manpower. Joining on the basis of the interview. Only those applicants will be allowed who have worked on at least 2 TBM projects.

https://jcmdevelopers.com/

Urgent requirement of slope protection design engineer minimum 8 years experience.
24/06/2022

Urgent requirement of slope protection design engineer minimum 8 years experience.

Cabinet Sports Minister Sh. Anurag Thakur at Z-Morh Tunnel
26/09/2021

Cabinet Sports Minister Sh. Anurag Thakur at Z-Morh Tunnel

It is a really great pleasure and proud moment for team JCM DEVELOPERS PVT LTD is associated with our client APCO infra ...
24/09/2021

It is a really great pleasure and proud moment for team JCM DEVELOPERS PVT LTD is associated with our client APCO infra Pvt ltd in Z-morh Tunnel project for Tunnel excavation works of both Main and escape tunnel from the Western portal end.
Today we are happy for making the Main Tunnel breakthrough/Daylighted of 6.5 km tunnel.
Our team has completed 3.5 km of excavation work within 1 year with many odds and technical, geological, and hydrological challenges faced. Today we are happy to declare that we have made tunnel delighted with successful ex*****on, this is our 3rd Project to complete after 1. The Chenani-Nashri tunnel project, 2. Banihal-Quazigund tunnel project
and
3.Z-Mohr Tunnel is our third project which we have completed.
Many more projects are in pipeline to be completed very soon.
Thank you
JCM DEVELOPERS PVT LTD
https://jcmdevelopers.com/

20/06/2021

Banihal- Qazigund tunnel trail run started for 2hs from today. By NEC and JCM team.

Breakthrough Escape Z-Mohr tunnel 6.5 KM Mr. Janak Singh Rathore (M. D., JCM Developers Pvt. Ltd.) with a team of APCO a...
16/06/2021

Breakthrough Escape Z-Mohr tunnel 6.5 KM Mr. Janak Singh Rathore (M. D., JCM Developers Pvt. Ltd.) with a team of APCO and JCM. The whole team is full of energy and joy.

Address

Jammu
Jammu
180015

Alerts

Be the first to know and let us send you an email when JCM Developers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share