Shiva Asphalt

Directions Website

Shiva Asphalt Bitumen Manufacturer | Road Construction Solutions
42+ Years Bitumen Industry Experience
Helping Road Contractors Build Stronger Roads 🛣️
📞 9310107716

01/10/2026

Monsoon Ke Baad Road Ka Kaam Shuru Karne Se Pehle Kya Check Karein?

Monsoon gaya, road construction ka season aa gaya. 🛣️Lekin pehli layer bichhane se pehle yeh 10 cheezein check karo:🏗️ S...
01/10/2026

Monsoon gaya, road construction ka season aa gaya. 🛣️

Lekin pehli layer bichhane se pehle yeh 10 cheezein check karo:

🏗️ SITE
✅ Base layer andar tak sukhi
✅ Drains saaf, camber sahi
✅ Purane potholes/cracks pehle repair
✅ WMM par prime coat, purani surface par tack coat
✅ Hot mix plant calibrated, aggregate dry

🛢️ MATERIAL
✅ Grade spec ke hisaab se, price ke hisaab se nahi
✅ Har tanker ke saath test certificate
✅ Tanker temperature check
⚠️ Storage tank ka monsoon ka paani pehle nikaalo — warna boil-over
✅ 30–45 din ka stock + rate lock

Pehle 2 hafte sahi = poora season sahi.
Stock planning me madad chahiye? DM karo

Vikas Poddar | Bitumen Expert
🌐 www.shivaasphalt.com

30/09/2026

Winter Aane Wala Hai — Aur Iska Bitumen Planning Pe Direct Asar Padता Hai।

Winter Aane Wala Hai — Aur Iska Bitumen Planning Pe Direct Asar Padता Hai।September khatam ho raha hai। Ab October-Novem...
30/09/2026

Winter Aane Wala Hai — Aur Iska Bitumen Planning Pe Direct Asar Padता Hai।

September khatam ho raha hai। Ab October-November mein construction activity peak pe hoगी — aur winter ki apni challenges bhi aayengi।

Winter Mein Bitumen Ko Lekar Kya Alag Hota Hai:

1. Cold Weather Mein Handling Mushkil
Low ambient temperature mein bitumen ka viscosity naturally badhता hai — application aur compaction thoda zyada carefully manage karna padता hai।

2. Demand Peak Pe Hoती Hai
Winter mein weather stable rehता hai construction ke liye — isliye demand is period mein sabse zyada hoती hai। Zyada demand matlab — stock availability tight ho sakती hai।

3. Transport Delays Possible
Kuch regions mein fog aur cold weather transport schedules ko affect karते hain — dispatch aur delivery timeline thoda unpredictable ho sakta hai।

Isliye Abhi Book Karna Sahi Hai:
✅ Current Rate Lock — winter demand spike se pehle
✅ Priority Stock Reservation — peak season mein availability guarantee
✅ Planned Delivery Schedule — transport delays se bachne ke liye buffer time
✅ Grade Planning — winter application ke hisaab se sahi grade select karne ka time milta hai

Practical Suggestion:
Agar October-December mein koi project hai — is hafte hi material planning finalize kar lo। "Jab zaroorat hogi tab dekh lenge" wala approach — peak season mein costly ho sakta hai।

September ka humara journey yahan complete hota hai — humne is mahine grade selection se lekar price crisis, waterproofing, aur ab winter planning tak sab cover kiya। Kal se October ka naya content plan shuru hoga।

Apna winter project ka timeline batao — abhi planning shuru karte hain।

📧 [email protected]
🌐 www.shivaasphalt.com

29/09/2026

10,000 LinkedIn Family Strong! 🎉 | The Journey Continues 🚀

Bitumen Kabhi "Expire" Nahi Hota — Lekin Long Storage Se Uski Quality Zaroor Badalती Hai।Yeh confusion common hai — "bit...
29/09/2026

Bitumen Kabhi "Expire" Nahi Hota — Lekin Long Storage Se Uski Quality Zaroor Badalती Hai।

Yeh confusion common hai — "bitumen toh permanent material hai, jitna chahe store karo।" Yeh partially sach hai, lekin poori tarah nahi।

Bitumen Storage Duration — Kya Samajhna Zaroori Hai:

Short-Term Storage (Few Weeks):
Properly sealed aur temperature-controlled storage mein — quality par minimal asar padता hai। Yeh normal operational storage hai, koi chinta ki baat nahi।

Long-Term Storage (Several Months+):
Yahan oxidative ageing ka risk shuru hota hai। Bitumen air ke contact mein aane pe dheere-dheere oxidize hota hai — chahe woh use ho raha ho ya storage mein pada ho।

Ageing Se Kya Hota Hai:
→ Pe*******on value kam hoती jaati hai (material harder ho jaata hai)
→ Ductility kam hoती hai (material zyada brittle ho jaata hai)
→ Softening point badhता hai
→ Overall — material apni original fresh properties khoने lagta hai

Storage Duration Ko Kya Affect Karta Hai:

1. Container Sealing
Achhi tarah sealed container mein ageing slow hoती hai, kyunki air exposure kam hota hai।

2. Temperature Fluctuation
Repeated heating-cooling cycles (jaise baar-baar heat karna, phir thanda hone dena) — ageing ko accelerate karता hai zyada।

3. Storage Environment
Direct sunlight/UV exposure aur high ambient temperature — ageing rate badhाते hain।

Practical Guidance:

Bulk order karte waqt — sirf itna order karo jitna reasonable time-frame mein use ho jaaye (typically 1-2 mahine ke andar)। Bahut zyada advance stock karna — agar proper storage conditions nahi hain — quality compromise kar sakta hai।

Agar long-term storage unavoidable hai — periodic testing karwao taaki pata chale material abhi bhi specification meet kar raha hai ya nahi।

Apni current storage duration ke baare mein sawaal hai? Batao।

📧 [email protected]
🌐 www.shivaasphalt.com

28/09/2026

Naya Supplier Choose Kar Rahe Ho? Yeh 12 Points Check Karo Pehle।

Naya Supplier Choose Kar Rahe Ho? Yeh 12 Points Check Karo Pehle।Sirf rate compare karke supplier choose karna — sabse b...
28/09/2026

Naya Supplier Choose Kar Rahe Ho? Yeh 12 Points Check Karo Pehle।

Sirf rate compare karke supplier choose karna — sabse bada mistake hai jo road contractors karते hain। Yahan hai complete checklist jo aapko sahi decision lene mein help karegi।

1. IS 73:2013 Certification
Kya supplier ke paas proper certification hai VG grades ke liye?

2. Test Report Har Supply Ke Saath
Pe*******on, softening point, ductility, flash point — documented milते hain?

3. Manufacturing vs Trading
Kya woh khud manufacture karते hain ya sirf trade karते hain? Manufacturer ke paas usually better quality control hota hai।

4. Business Registration/GST
Legitimate registered business hai — verify karo।

5. Track Record/Years in Business
Kitne saal se market mein hain? Naya, unknown supplier bada order ke liye risky ho sakta hai।

6. Storage Facility Quality
Kya unka storage temperature-controlled aur properly maintained hai?

7. Transport — Insulated Tanker
Delivery insulated tanker mein hota hai ya normal?

8. Dispatch Timeline
Standard order ke liye kitna lead time deते hain? Commitment pe deliver karte hain?

9. Payment Terms Flexibility
Advance, credit, ya phased payment — options available hain?

10. Technical Support
Grade selection mein guidance milती hai, ya sirf material supply karते hain?

11. Multiple Grade Availability
Sirf VG-30 hai, ya PMB Bitumen, CRMB Bitumen, Emulsion bhi available hain? Ek hi supplier se multiple needs pura hona convenient hai।

12. Existing Customer References
Kya woh apne existing customers se baat karne ki permission deते hain? Real feedback sabse valuable hota hai।

Simple Rule:

Agar supplier in 12 mein se 8-9 points pe confidently "yes" bol sakta hai — woh trustworthy hai। Agar zyada tar sawaalon ka jawab vague hai — dusra option dekho।

Apne current supplier ko is checklist pe evaluate kiya kabhi? Comment mein batao।

📧 [email protected]
🌐 www.shivaasphalt.com

Ek Waterproofing Contractor Ne Sahi Product Choose Kiya — Aur Ab Woh Apne Poore Network Ko Refer Kar Raha Hai।Kuch mahin...
26/09/2026

Ek Waterproofing Contractor Ne Sahi Product Choose Kiya — Aur Ab Woh Apne Poore Network Ko Refer Kar Raha Hai।

Kuch mahine pehle ek contractor ne humse Bitumen Paint liya tha ek underground tank waterproofing project ke liye। Uski situation thi — pehle kisi aur brand se try kiya tha, 4 mahine mein hi seepage wapas aa gaya tha।

Humne Kya Suggest Kiya:
Sahi surface preparation, 2 coats overlapping direction mein, aur underground application ke liye extra thick layer। Simple guidance, koi complicated process nahi।

Result:
6 mahine ho gaye — zero seepage। Client fully satisfied, aur contractor ne humein 3 aur contractors ko refer kiya apne network se।

Yeh Story Share Karne Ka Reason:
Sahi product ke saath sahi guidance mile — toh result guaranteed behtar hota hai। Aur jab kaam achha hota hai, log naturally recommend karते hain।

Is Weekend Ka Referral Offer:

Apne network mein kisi aur contractor ko refer karo — unka pehla order confirm hone pe:
✅ Aapko discount agle order pe
✅ Unhe special first-order rate
✅ Dono ke liye free technical consultation

Simple hai — koi complicated process nahi।
Refer karna hai kisi ko? DM karo unka contact।

📧 [email protected]
🌐 www.shivaasphalt.com

25/09/2026

Monsoon Ke Baad Damage Kahan Hua — Pata Hai? Free Assessment Le Lo।

Address

📍 214, M. J. Shopping Center, Shakarpur, New Delhi
Delhi
110092

Alerts

Be the first to know and let us send you an email when Shiva Asphalt posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share