Kamal construction

Kamal construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Kamal construction, Construction Company, GE Road/Padum Nager/Bhilai/3 , DURG ( CG), Bhilai.

Estblished in the Year - 2011, The KAMAL CONSTRUCTION- India's premier Consultants for Projects Infrastructure Services & Solutions For - Power / Railway / Road / Building / MEP / Solar Energy / Irrigation /Jal Jeevan Misson / Mining / Skilled Team

06/08/2026

🚨 *INFRASTRUCTURE UPDATE*:

Assam Highway Mega Project Approved! 🛣️✨

The Union Cabinet (CCEA), chaired by PM Narendra Modi, has approved the 4-lane access-controlled *Guwahati–Tezpur Highway Corridor* on NH-15 in Assam.

📌 *Key Highlights & Project Details*:
Total Cost: ₹8,970.20 Crore 💰
Length: 135.871 Km (4-lane access-controlled corridor)
Ex*****on Mode: Built-Operate-Transfer (BOT) Toll Mode under NH(O)
Route: NH-15 (Guwahati to Tezpur, Assam)

🌉 *Key Structures & Scope of Work*:
Bypasses: 5 Major Bypasses totaling 58.7 Km (decongesting Baihata Chariali, Sipajhar, Kharupetia, Dhekiajuli & Tezpur).
Bridges & Structures:
15 Major Bridges
30 Minor Bridges
19 Flyovers
46 Underpasses
1 Elephant Underpass (in Tezpur bypass)
210 Km of Service Roads

*Defense & Strategic Feature*: 4.9 Km Emergency Landing Facility (ELF) in Tezpur Bypass, finalized in coordination with the Indian Air Force (IAF).

*Traffic Impact*: Decongests the existing NH-27 (East-West Corridor) on the south side of the Brahmaputra River.

06/08/2026

📢 TENDER RESULT | NOIDA METRO RAIL CORPORATION LTD.
Aarvee Engineering Consultants Limited has emerged as the lowest bidder (L1) at *₹51.51 Cr* for general consultant services covering *15.113 km* of elevated metro line extensions in Noida, Uttar Pradesh.
📌 KEY HIGHLIGHTS
• Estimated Cost: ₹75.56 Cr
• EMD: ₹75.56 L
• Completion Period: 1,460 days
• L1 Savings: -31.8% below estimate
📊 BIDDER SUMMARY
1️⃣ L1: Aarvee Engineering Consultants Ltd.
• Bid: ₹51.51 Cr | vs EST: -31.8% | Status: L1
2️⃣ L2: Ayesa India Private Limited
• Bid: ₹54.85 Cr | vs L1: +6.5% | vs EST: -27.4% | Status: Accepted
3️⃣ L3: Consulting Engineers Group Ltd.
• Bid: ₹61.00 Cr | vs L1: +18.4% | vs EST: -19.3% | Status: Accepted
4️⃣ L4: Rites Limited
• Bid: ₹67.82 Cr | vs L1: +31.7% | vs EST: -10.2% | Status: Accepted
5️⃣ L5: Nippon KOEI India Private Ltd.
• Bid: ₹77.81 Cr | vs L1: +51.1% | vs EST: +3.0% | Status: Accepted
❌ Balaji Railroad Systems Ltd.
• Status: Rejected (Technical)

06/08/2026

We're Hiring | AGM / Dy. GM - Planning

Location: PAN India (Project-Based)

We are looking for an AGM / Dy. GM - Planning to join our team for large-scale Metro, Railways & Transportation Infrastructure Projects.

Mandatory Requirements:

Proven experience in Planning for Metro, Railways, or Transportation Infrastructure Projects.

SAP exposure is mandatory.

Strong understanding of project planning, scheduling, monitoring, and reporting.

Experience working on EPC/Infrastructure projects will be an added advantage.

B.Tech (Civil Engineering), PGCM - NICMAR will be an added advantage.

Compensation Criteria:

$Current CTC must be ₹30 LPA or above.

Please do not share profiles below this compensation level.

Important Screening Criteria:

X No profiles from non-transportation infrastructure sectors.

X No profiles without SAP exposure.

X No profiles with current CTC below ₹30 LPA.

DE Share relevant profiles at: [email protected]

Please share this opportunity within your network if you know suitable professionals.

06/08/2026

Adani Energy Solutions Limited (AESL) has secured an inter-state transmission project worth approximately ₹8,500 crore in Andhra Pradesh. The project, titled "Transmission System for Proposed Green Hydrogen / Green Ammonia Projects in Vizag Area, Andhra Pradesh (Phase-I)," was awarded through the Government of India's Tariff-Based Competitive Bidding (TBCB) process, where AESL emerged as the successful bidder.

The transmission network will support the power requirements of upcoming Green Hydrogen and Green Ammonia projects in the Vizag region, catering to an estimated 4,500 MW of demand. In addition, the project is expected to strengthen the power infrastructure for the rapidly growing Pendurthi–Vizag corridor, which is witnessing significant investments in data centres and digital infrastructure.

The project will be executed through a Special Purpose Vehicle (SPV) named Vizag Power Transmission Limited. Its scope includes the establishment of 765/400 kV GIS substations at Pendurthi (Vizag) and Khammam-II, along with the addition of 1,582 circuit kilometres (ckm) of transmission lines and 10,500 MVA of transformation capacity. The project is scheduled for completion within 30 months.

The order further strengthens AESL's transmission business, taking its transmission order book to over ₹80,000 crore. Upon completion, the company's total transmission network will expand to 29,531 ckm, with a transformation capacity of 1,33,675 MVA, reinforcing its leadership in India's power transmission sector.

Adani Energy Solutions Limited is India's largest private power transmission company, with operations spanning power transmission, electricity distribution, smart metering, and cooling solutions. The company serves approximately 13 million electricity consumers and continues to expand its presence through large-scale transmission and energy infrastructure projects across the country.

Project
05/08/2026

Project

Job
05/08/2026

Job

Job  #
05/08/2026

Job #

Address

GE Road/Padum Nager/Bhilai/3 , DURG ( CG)
Bhilai
490021

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Kamal construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kamal construction:

Shortcuts

Share