Call Directions Website Contact the business

ASM PT ANUGERAH SAMUDERA MADANINDO (ASM)

Expanding Our International Footprint | Pohnpei Port Expansion Project📍 Pohnpei, Federated States of MicronesiaPT Anuger...
03/10/2026

Expanding Our International Footprint | Pohnpei Port Expansion Project

📍 Pohnpei, Federated States of Micronesia

PT Anugerah Samudera Madanindo (ASM) is pleased to announce another significant milestone in our international expansion journey through the Pohnpei Port Expansion Project in the Federated States of Micronesia.

This project represents ASM’s second international project, strengthening our growing presence in the regional marine infrastructure sector and expanding our capabilities beyond the Indonesian market.

Building on our extensive experience in marine construction and infrastructure projects across Indonesia, ASM continues to bring our commitment to engineering excellence, quality, safety, and operational integrity to every project we undertake

KEEPING THE CHANNEL MOVING.At Muara Satui, ASM delivers maintenance dredging services for PT Arutmin Indonesia, maintain...
19/09/2026

KEEPING THE CHANNEL MOVING.

At Muara Satui, ASM delivers maintenance dredging services for PT Arutmin Indonesia, maintaining a critical 5.3 km navigation channel that supports continuous coal barge operations.

Operating in shallow and confined waters with active barge traffic, Crane Barge Cakra 68 and Tugboat Equator handle up to 48,000 BCM of dredging volume per month, maintaining the required channel depth and ensuring safe and uninterrupted operations.

With precision in every cut and control in every operation, ASM remains committed to maintaining the channel and supporting the continuity of marine logistics at Muara Satui.

ASM — Marine Construction Expert.

DELIVERING PERFORMANCE. OVERCOMING CHALLENGES. COMPLETING THE MISSION.PT Anugerah Samudera Madanindo is proud to have su...
13/09/2026

DELIVERING PERFORMANCE. OVERCOMING CHALLENGES. COMPLETING THE MISSION.

PT Anugerah Samudera Madanindo is proud to have successfully completed key nearshore services for the WNTS–Pemping Island gas pipeline project, including pre-trenching, pipe beach pull, backfilling, and related offshore, nearshore, and onshore works.

Despite hard materials, strong currents, limited tidal windows, and a tight schedule, our team delivered through careful planning, technical capability, and determination. This milestone reflects ASM’s commitment to delivering reliable solutions and performing safely and effectively in challenging marine construction environments.

Health Talk: ‘The Hidden Risks Behind Everyday Work Routines’A healthy workplace starts with taking care of our people.I...
11/09/2026

Health Talk: ‘The Hidden Risks Behind Everyday Work Routines’

A healthy workplace starts with taking care of our people.

In our Health Talk session, ‘Ergonomic Risks in the Workplace’, PT ASM raises awareness of proper working posture, preventing work-related discomfort and maintaining long-term health.

Safety is not only about the workplace; it’s also about taking care of ourselves every day.

Special thanks to Klinik Utama SatuSehat for their support, and to Edo | Sports Massage | Massage Therapist for sharing valuable insights as our speaker during this session.

05/09/2026

PT ASM is proud to contribute to the successful ex*****on of trenching, beach spooling and pipelaying works for the WNTS gas pipeline construction project to Pemping Island.

Working alongside a team of construction specialists, we utilise our marine construction expertise to ensure the project is delivered safely, efficiently and successfully.

PT ASM: Building Together, Delivering Excellence.

Celebrating Environmental Day through actionASM was honoured to join PT Arutmin Indonesia and fellow partners in a tree ...
14/07/2026

Celebrating Environmental Day through action
ASM was honoured to join PT Arutmin Indonesia and fellow partners in a tree planting activity.

Delivering reliable marine solutions through the successful ex*****on of the Seawater Outfall Pipe Repair Project at Ban...
05/06/2026

Delivering reliable marine solutions through the successful ex*****on of the Seawater Outfall Pipe Repair Project at Banggai Ammonia Plant.

“It’s basically like playing real-life Tetris by the ocean.” Except this version comes with heat, dust and waves, and th...
11/05/2026

“It’s basically like playing real-life Tetris by the ocean.”

Except this version comes with heat, dust and waves, and there’s no reset button if you mess up.

Seawall – Patimban Port Development Project

“Where strength meets the ocean”We deliver excellence through skill, discipline and teamwork.
04/05/2026

“Where strength meets the ocean”
We deliver excellence through skill, discipline and teamwork.

Bianca in action: supporting dredging operations for the West Natuna Transportation System (WNTS) gas pipeline construct...
27/04/2026

Bianca in action:
supporting dredging operations for the West Natuna Transportation System (WNTS) gas pipeline construction project to Pemping Island.

Every movement is carried out with precision, reliability and a commitment to excellence, contributing to the construction of stronger offshore connectivity and energy infrastructure.

We deliver progress beneath the surface and create impact above it.

Address

Ruko Festive Citragrand A No. 32, Kel. Sambiroto, Kec. Tembalang
Semarang
50276

Opening Hours

Monday 09:00 - 05:00
Tuesday 09:00 - 05:00
Wednesday 09:00 - 05:00
Thursday 09:00 - 05:00
Friday 09:00 - 05:00
Saturday 09:00 - 02:00

Telephone

+6288706618887

Alerts

Be the first to know and let us send you an email when ASM posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ASM:

Shortcuts

Share