Footasylum Trafford Centre - 245m² microcement floor installation
Forcrete
This install required detailed preparation works prior to the microcement system being applied. The floor design incorporated a series of triangular microcement sections surrounded on all sides by a tiled finish, making accurate levels and transitions critical to the final result.
BT Microcement were trusted to prepare the substrate using approximately 20mm of self-levelling compound, bringing the floor precisely up to the tile trim. Careful attention was given to achieving consistent levels across each section, ensuring the tiled and microcement surfaces would meet seamlessly without any unwanted steps or changes in floor height.
With a tight commercial programme, our full eight-man install team worked through the nights to maintain an efficient, uninterrupted installation. Following three days of detailed substrate preparation, the complete 245m² microcement installation was delivered over five days, keeping the project on schedule.