21/08/2026
EXTERIOR WORKS 🏡 🍃
A lot went into this one… but what a finish. 👌🏼
With the wisteria removed from the front of the property, we were able to get right back to the substrate and give the exterior the preparation it needed.
The loose paintwork to the front was completely removed, along with any failing areas elsewhere around the property. The walls were then fully stabilised before applying 2–3 coats of Smooth Masonry in Cornish Cream.
All woodwork was thoroughly prepped before finishing:
🌿 Fascias, gutters, downpipes & doors — exterior eggshell - Olive
🌱 Windows & frames — exterior eggshell - Ball Green
⚫ lighting units & damp course — Zinsser AllCoat- Satin Black
🪵 Oak conservatory pillars & arch ceiling walkthrough — - UV Protection Oil
A huge amount of preparation and attention to detail went into this exterior, bringing everything together while keeping the character of the property.
Really pleased with how this one turned out. 🤍
Cole & Winfield Decorating
Preparation. Detail. Finish.