13/07/2026
Water damaged flooring.
Neil originally asked me to sort out a problem with his bathroom after being recommended by one of my previous customers.
While I was there, the topic of the floor came up, he mentioned the hallway floor had been damaged by a leaking boiler.
Once I fixed the bathroom problem I investigated the old flooring, it was clear it wasn’t just a case of laying a new floor. Everything underneath needed drying properly first, and there was black mould behind the skirting that had to be dealt with before anything went back down.
A few days later, once it was all dry, the new engineered oak floor went in, the skirting and walls were redecorated, and I also replaced the bath panel while I was there.
Neil was really pleased with how it turned out and even asked me back to decorate more of the his flat.
A nice job to finish, and another happy customer.