07/09/2026
Final touches finishing off the Standlake project
We’re into the final stages, with the last few jobs now being completed:
• Copings and paving to the terrace, installed on pedestals to help reduce the overall weight
• Fencing
• Finishing the Cotswold stone edgings to the driveway
• Topsoiling — using the original topsoil that was stripped and set aside at the start of the project, saving on both material and haulage costs 🌱
Just the gravel driveway to go once all the other trades have finished, and this one will be complete! 👌