03/09/2026
The peach house function room at Wolterton Hall. Installed Ditra Matt and laid 130m2 of 17/21mm limestone in 3 sizes installing 6 floor socket boxes and grouting in limestone ultra grout with 3 coats of sealer 1 before and 2 after grouting then finished with limestone silicone to expansion joint, door thresholds and columns.