28/07/2026
On site for a baseline blower door test at our low-energy retrofit and roof extension project in the High Weald near Penshurst.
The air permeability was 9.59 with significant air leakage identified from the existing 1980s loft conversion, which we're replacing with an enlarged, well-insulated roof extension. The existing suspended timber floor also (unsurprisingly) was not very air-tight, which we will also look to address as part of the works.
We're looking forward to seeing this project on site.
Please do get in touch to see how we can help with your low-energy project.
[email protected]
07792678564