Davies Torres Design Ltd

Davies Torres Design Ltd Structural engineers and interior designers in Gloucestershire. Experienced in alterations, new build, and conservation.

A 1950's steel framed building, previously a chicken shed, surveyed last week before being upgraded for further use.  Th...
07/03/2026

A 1950's steel framed building, previously a chicken shed, surveyed last week before being upgraded for further use. The roof frames were manufactured in three sections and then bolted. The gable frames had flat head chamferred bolts so they didn't clash with the cladding.

It was all in relatively good condition with only some small sections of delamination where the posts were embedded into the concrete base.

A few images from an almost complete extension to house near Stroud. Brick panels and timber infill panels.
23/08/2025

A few images from an almost complete extension to house near Stroud. Brick panels and timber infill panels.



Last day of the school holidays - a day Out of the Office.
26/04/2025

Last day of the school holidays - a day Out of the Office.

We went for a walk today and saw one of our projects from across the valley.  What was a typical bungalow has had a cont...
21/04/2025

We went for a walk today and saw one of our projects from across the valley. What was a typical bungalow has had a contemporary extension and other alterations.



Trenches excavated and then concrete being pumped in.  Ready for new side extension.
15/01/2025

Trenches excavated and then concrete being pumped in. Ready for new side extension.

A building constructed in around 1800 with a principal rafter and purlins to each roof pitch.  Unusually, the rafter sit...
08/12/2024

A building constructed in around 1800 with a principal rafter and purlins to each roof pitch. Unusually, the rafter sits onto a bearing plate in the stonework and is not connected to the floor beam. On top of that the rafter has failed at the purlin due to extent of notching and a knot causing additional weakness. The resulting thrust has pushed the stonework out slowly over the last 200 years as can be seen by the dog leg gutter in the final photograph.

Some brackets required to connect the timbers and then stitching to tie the stonework to the floor.

Heres a project completed earlier this year - a new visitor centre and cafe at Berkeley Castle.
28/07/2024

Heres a project completed earlier this year - a new visitor centre and cafe at Berkeley Castle.

Section of a timber beam that has largely turned to dust after being tunnelled out.
20/06/2024

Section of a timber beam that has largely turned to dust after being tunnelled out.

Assessment of load capacity for a solar panel installation for JDC Electrical. Visit to see installation in progress.   ...
05/06/2024

Assessment of load capacity for a solar panel installation for JDC Electrical. Visit to see installation in progress.


Address

Clarence House, Church Street
Stroud
GL60BP

Opening Hours

Monday 9am - 5:30pm
Tuesday 9am - 5:30pm
Wednesday 9am - 5:30pm
Thursday 9am - 5:30pm
Friday 9am - 4:30pm

Alerts

Be the first to know and let us send you an email when Davies Torres Design Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share