21/10/2026
Off-site fabrication in action. 🏭
The Framwellgate School project is a good example of how prefabrication simplifies a build. Pile caps and beams were manufactured off-site, delivered to site, lifted into position and spliced together. Floor slabs followed using loose reinforcing bar, with mesh reinforcement for the upper floors.
Less time on site. Better quality control. A cleaner programme. 💪