04/06/2026
A patch and skim around this skylight. Client removed a heavy mould around the outside which left a 13mm strip to be filled and 4 rough reveals which couldn’t be painted.
Plasterboard applied, scrim tape to prevent any future cracking, bonding coat to strengthen it all in preparation for skim coat. Beads applied round the outside giving that neat edge followed by two coats of finish and feathered into existing ceiling.
Perfect finish, Spotless and another happy client :)))) 🙌