12/07/2026
It’s been a busy couple of weeks working through the heatwave! ☀️🥵
Two load-bearing walls removed and two substantial steels installed, 152x152 UC, 4.5m and 4m in length. Both steel installations signed off by NHBC 🙌🏻
We worked closely with both the client and the structural engineer to make changes to the original design, removing the need for steel columns and helping to significantly reduce the overall cost of the project.
Now to fireproof the steels and complete the remaining remedial work!
We always work with our clients to achieve not only an amazing finish, but also to identify potential savings wherever possible, without compromising on quality, safety or compliance.
35 years of experience helps make this possible. 👷♂️🔨