12/10/2026
Commercial solar designed for a high-energy industrial site. ☀️
Four Seasons Fuel approached DW Energy after rising electricity costs became a growing concern at its Coneyhurst premises. With heavy machinery operating alongside the company’s office facilities, the site required a substantial and reliable source of on-site electricity generation.
DW Energy designed and installed a 106.9 kWp commercial solar PV system featuring:
• 264 Solarwatt panels
• 48 panels across the office building
• 216 panels across the warehouse
• Three SolaX three-phase inverters
• Specialist fixings selected for the fragile warehouse roof
Careful planning allowed the available roof space to be maximised without compromising the warehouse roof’s watertight integrity.
The completed system now generates electricity to support both the office and machinery-intensive warehouse, helping reduce the business’s reliance on grid power when solar energy is available.
Planning solar for an industrial or high-energy site? Speak with DW Energy about a system designed around your electricity demand, roof construction and existing infrastructure.