19/09/2026
A shower enclosure which had failed severely. The job involved removal of existing screen/enclosure tiles and and 3/8 plasterboard stuck to the walls. Reinstall moisture grade plasterboard with sufficient wallboard adhesive and apply sealant to all joints. Install new wallboard finish to both walls, supply and install a new 900mm shower screen/enclosure, as a extra preventative install new minor upstand, corner profile for extra piece of mind for the client.