Beaver Bridge Hire

Call Directions Website Contact the business

Beaver Bridge Hire Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Beaver Bridge Hire, Construction Company, The Warehouse, Shrewsbury.

Imagine a wind farm in a remote location with access issues.These projects demand sturdy, reliable infrastructure to con...
02/05/2024

Imagine a wind farm in a remote location with access issues.

These projects demand sturdy, reliable infrastructure to connect energy sources to the grid. But what about access issues in these remote areas?

SSE Renewables approached Beaver Bridge Hire Ltd in the trust we could support them with temporary access due to restrictions at the Stronelairg Wind Farm in Fort Augustus.

To accommodate this request Beaver Bridge Hire Ltd installed a Heavy Duty Bridge to maintain the vehicle access required for SSE. Already being in-situ for 9 months, a recent visit confirmed the bridge continues to provide faultless performance for their temporary access.

Our Heavy Duty Vehicle Bridges can be assembled in multiple variations to allow 196Tonne of load capacity (LM3, SV196).

To discuss your projects needs today, please reach out via
E: [email protected]
T: 01743 811 812




Temporary bridging Tuesday ๐ŸŒ‰ Beaver Bridge Hire has great pleasure introducing the new 11m x 6m Beaver Crossing Unit to ...
16/04/2024

Temporary bridging Tuesday ๐ŸŒ‰

Beaver Bridge Hire has great pleasure introducing the new 11m x 6m Beaver Crossing Unit to accommodate the Newport BESS project for Clarke Enegry.

Clarke Energy have a highly desirable scope to deliver this project, while having the challenges to accommodate these works under a (TPOโ€™s) Tree Protection order.

Beaver Bridge Hire Ltd's team delivered a full turnkey proposal with the installation of this bridge over night, over spanning the tree roots under a (TPO) to allow Clarke Energy to continue the development of the BESS project.

Our newly manufactured (BCU) Beaver Crossing Unit can be assembled in four configurations to allow 80Tonne of load capacity (SV80).

1) 11m x 1.5m
2) 11m x 3m
3) 11m x 4.5m
4) 11m x 6m

This modular BCU is a great bridge to overcome any difficulties you may experience in the delivery of your project, may that be renewables, construction, telecoms , gas/water works and much much more.

To discuss your projects needs today, please reach out via
E: [email protected]
T: 01743 811 812

01/02/2024
02/01/2024
HAPPY NEW YEAR ๐ŸŽ‡ 2๏ธโƒฃ0๏ธโƒฃ2๏ธโƒฃ4๏ธโƒฃConcept to Completion!As we start 2024, we wanted to reflect on what an amazing year of bus...
02/01/2024

HAPPY NEW YEAR ๐ŸŽ‡ 2๏ธโƒฃ0๏ธโƒฃ2๏ธโƒฃ4๏ธโƒฃ

Concept to Completion!

As we start 2024, we wanted to reflect on what an amazing year of business we had here at Beaver Bridge Hire in 2023, it wouldn't be possible without a great team, supply chain and excellent clients. We thank you all, with fantastic achievements accomplished with plenty more to come.

Quality๐Ÿ”ดPace๐Ÿ”ดTogether

"Those who say in cannot be done, should not interrupt those doing it"




The Final Install of 2023.As we approach the closing stages of 2023, We had the pleasure of installing this 7.65m x 3m S...
22/12/2023

The Final Install of 2023.

As we approach the closing stages of 2023, We had the pleasure of installing this 7.65m x 3m Short Span Vehicle Bridge for Kier Group within a tight schedule just before Christmas.

Thank you to all of the team at Kier in assisting Beaver Bridge Hire Ltd in completing this project.



Merry Trussmass ๐ŸŽ… ๐ŸŒ‰Christmas has landed at the  /  HQ!  ๐ŸŽ„ ๐ŸŽ On the run-up to Christmas, Beaver Bridge Hire Ltd and Beave...
06/12/2023

Merry Trussmass ๐ŸŽ… ๐ŸŒ‰

Christmas has landed at the / HQ! ๐ŸŽ„ ๐ŸŽ

On the run-up to Christmas, Beaver Bridge Hire Ltd and Beaver Bridges Ltd are continuing to work very hard to ensure all new and exciting clients are supported within all requirements.




Beaver Bridge Hire and Beaver Bridges had the pleasure of attending Oswestry School today.Steve Johnson MA, MCIPD our He...
30/11/2023

Beaver Bridge Hire and Beaver Bridges had the pleasure of attending Oswestry School today.

Steve Johnson MA, MCIPD our Head of HR for Beaver Bridges , Jonathon Smith our Project Manager for Beaver Bridges and Jase Whittall our Business Development Manager for Beaver Bridge Hire Ltd felt a deep sense of contentment when presenting all possible career opportunities with Beaver Bridges group.

We want to provide full support and development for all the students with the correct information to be successful within the sectors they aspire to work within.




Beaver Bridge Hire as part of Beaver Bridges group, we would like to congratulate them on this fantastic install. The pe...
28/11/2023

Beaver Bridge Hire as part of Beaver Bridges group, we would like to congratulate them on this fantastic install.

The people of Shropshire are waking up to a new bridge on the horizon this morning following the successful installation of our bespoke Active Travel Bridge, safely installed over the A5 at Mile End Junction, Oswestry overnight.

The 50m x 3.5m Bridge was manufactured at our Beaver Bridges manufacturing facility and delivered to site and installed using our fully in-house teams.

Using a 1000 Tonne crane supplied by BALDWINS CRANE HIRE LIMITED to lift the 68 Tonne bridge into place, one of the largest cranes in the country, onto newly constructed concrete foundations, delivered as part of Beaver Bridges unique full turnkey bridging services.

They are extremely proud to have delivered this bridge within our home county of Shropshire on the Mile End trilogy marking the second key development to the area following the junction improvements. It has also been great to watch them working in collaboration with our client Shropshire Council & WSP in the UK

The on-site activities will continue with the installation of around 200 metres of ramps, drainage and landscaping, which will see the completion of the works by spring 2024.

And to top it off, last nights full moon was officially called a 'Beaver Moon'.

'Those who say it cannot be done, should not interrupt those doing it'




Temporary bridging ๐ŸŒ‰Beaver Bridge Hire Ltd had the pleasure of installing this 20m x 3m BR90 up-and-over bridge suitable...
27/11/2023

Temporary bridging ๐ŸŒ‰

Beaver Bridge Hire Ltd had the pleasure of installing this 20m x 3m BR90 up-and-over bridge suitable for 44 Tonne in Cumbria for

Slightly difficult surcumstances due to there being weight restrictions on the public highway, leading us to splitting the bridge down onto 9 Tonne flatbed wagons and carried out a launching sequence over the permanent structure. (No crane require)

The site team delivered a very successful install with harsh conditions, well done team.




Address

The Warehouse
Shrewsbury
SY13TB

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

01743811812

Alerts

Be the first to know and let us send you an email when Beaver Bridge Hire posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Beaver Bridge Hire:

Shortcuts

Share