18/01/2026
Big job from the summer in the heat 🥵
It was a hard slog, but it’s always rewarding when it’s completed.
The render was fully removed as it was shot and hollow to the tap. Brickwork pva’d before walls were boarded.
A new stud wall was erected, and both rooms had ceilings overboarded and walls dot and dabbed, then both rooms fully skimmed.