03/05/2020
A recent project carried out for a local client.
The complete mains cupboard required an upgrade following a number of electrical faults resulting in power failures for the tenants.
Along with remodelling the design of the mains cupboard a new 18th consumer unit has been installed incorporating surge protection and RCBO's. Mains tails feeds have been upgraded, and the mains earthing has been improved to current standards.
If you would to be interested in having your electrical installations inspected or having works carried out to bring your installation in line current standards then please get in touch with us ⚡🔌⚡