Work has begun on upgrading a system today, removal of 3 vaillant ecomax 35kw boilers that have done 26 years of hard graft. We are installing 2 vaillant ecotec plus 64kw boilers and separating them from the system with a plate heat exchanger to prolong the life of them.
1st stage is underway with the removal of one of the old boilers and installation of the first new boiler and the plate heat exchanger π¨π»βπ§