14/08/2026
Recent job completed by the lads this week, to start they ripped the old drive and front garden out. Also front path was taken out ready for dropped kerbs. Once front was down the lads installed a sleeper retainer and area for steps. Then sleepers were put to separate the drive in front of garage to lower area of the garden. Sleepers were also put on the opposite as a boarder. Steps were built into area and blocks were put down as a boarder around, blocks were also put in the steps and two block linesa came down in line with the steps. Once blocks were finished the drop kerbs and m.o.t was put in ready for the tarmac. Cant thank kev and tom from Cefn Mawr Driveways LTD enough and there lads for a top job with the tarmac. Once tarmac was put in, black ice stone was put in the areas at the top to finish the job. Also cant thank rob and shelley enough for there hospitality