17/10/2026
PART 2 OF OUR RECENT FULL HOUSE RENOVATION — CURRENTLY UNDERWAY 🏠
This one has been stripped right back and completely reworked from the ground up.
Downstairs:
• Living room floor raised by 23mm and levelled throughout
• New wall formed between the kitchen and living room
• Plaster-in LED profiles installed
• Bespoke media wall
• New oak staircase with glass balustrade going in next
• Full downstairs skim complete
• Decoupling membrane and tiled flooring throughout
• New doors, linings, skirting and architraves
Part 3 to follow: Full house walk through
- Bespoke wardrobes
- Upstairs floors tiled
- Fully second fixed electrics
- Mirror brick tiles installed in kitchen
- All ready for painting.
Part 4 to be fully decorated and finished article. We can’t wait to show this one 🤩
Still plenty to come on this one.
Full renovation bookings for 2027 are now open.