10/08/2026
A nice before & after from a recent job in Northallerton!
We recently helped get a busy pedestrian footbridge back open after its existing timber walkway reached the end of its service life.
The bridge provides an important access route to local allotments, but after many years of use, the timber decking had deteriorated significantly due to wood rot. The bridge was subsequently condemned and closed. Northallerton Council approached Elemy Ltd looking for a durable, long term replacement, and with the route needing to reopen as quickly as possible, time was important.
⚡From initial enquiry to supply and installation in just 7 days:
Our team replaced the old timber walkway with 53mm solid top GRP decking, with the complete installation carried out in just half a day.
The works included removing and disposing of the old timber deck, preparing the existing support structure, packing the supporting steelwork with 50mm square GRP box section, and installing the new GRP walkway.
GRP is a great alternative to traditional timber for pedestrian bridges because it:
• Won’t rot or corrode
• Requires minimal ongoing maintenance
• Provides excellent durability
• Offers a slip-resistant walking surface
• Is lightweight, making installation quicker and easier
• Provides a long service life, particularly in exposed outdoor environments
And most importantly, the bridge is back open and ready for plenty more foot (and paw🐾) traffic. In fact, swipe to the end to see one of the first visitors across the new bridge - Foxy the dog!
Need to replace a deteriorating timber walkway, footbridge or access platform? Get in touch with Elemy Ltd to see where GRP could provide a longer lasting alternative - [email protected] // 01642 480844