05/09/2026
🏗️ 120m² – IT’S ALL IN THE PREP 🏗️
Another 120m² floor prepared properly by Southern Liquid Screed, ready for screeding.
There’s a lot more to a quality floor than simply turning up and pouring screed. What goes underneath is just as important as the finished surface.
On this project we installed:
🔹 Blinding sand – used to level out irregularities in the existing concrete slab and provide a smooth, even base for the following layers.
🔹 1200 gauge DPM – creating a robust damp-proof barrier to help prevent ground moisture travelling up through the floor construction.
🔹 50mm Celotex insulation – helping reduce heat loss through the floor and improving the efficiency of the underfloor heating system.
🔹 500 gauge slip membrane – providing separation between the insulation and screed while helping protect the build-up during installation.
🔹 Underfloor heating – carefully laid out and secured, ready to provide even, efficient heat throughout the finished space. 🔥
📩 Southern Liquid Screed – get in touch for your next project.
Screeding FloorInsulation Celotex DPM FloorScreed ConstructionUK UnderfloorHeatingUK ScreedFloor NewBuild RenovationUK