Sandhill Plant and ATV

Call Directions Website Contact the business

Sandhill Plant and ATV Sandhill Plant buy and sell all types of used plant and equipment, fully equipped service department supplying the UK while also exporting worldwide

Sandhill Plant was formed in 2012 assisting business's in asset disposal, selling on behalf of Limited company's and individuals to achieve a greater return on investment of assets. Part of our company's skill set is the analysis of purchasing, using experience gained in previous roles selling new equipment we can often save company's expenditure on asset purchases

In the last 4 years our company has grown significantly and as such we are also trading used plant and machinery. With premises near Leighton Buzzard. Our goal is to supply a honest and reliable service with genuine reliable machines

In 2016 we became Quadzilla ATV dealers, supplying new quad bikes and side by side utility vehicles to a variety of customers including the plant and machinery sector, agricultural sector, private purchases, and national parks. In our first year we sold over 130 units and put ourselves on the map as a key supplier of Quadbikes in our local area and beyond. With over 100 Quadzilla dealers in the UK with our hard work, great service and a full range of stock we pushed to enter the top 10 Quadzilla dealers

If you are looking to sell assets we can help advertise, promote and achieve a greater return
If you are looking for a "trade" offer we can offer some of the best prices for used plant and machinery
If you are looking for agricultural vehicles and attachments we can supply a full Quadzilla range of vehicles from 400cc - 800cc quad bikes and utility vehicles and 50cc - 100cc childs quads. All backed with a manufactures warranty from 1-2 years
If you are looking for used equipment of the highest standard please give us a call or message, we can assist in finding stock or we may have it ourselves

We have built a great reputation in our industry, we have a great number of reviews which can be seen on the CEforum website and our page, all can be seen by googling Sandhill Plant

Our contact details
www.sandhillplant.com
01525 303910
[email protected]

𝗧𝗛𝗘 𝗕𝗜𝗚 𝗤𝗨𝗘𝗦𝗧𝗜𝗢𝗡𝗦 — 𝗘𝗣𝗜𝗦𝗢𝗗𝗘 𝟯Hiring machines vs owning machinesOWN THE MACHINE — OR HIRE WHAT YOU NEED?Some businesses s...
16/10/2026

𝗧𝗛𝗘 𝗕𝗜𝗚 𝗤𝗨𝗘𝗦𝗧𝗜𝗢𝗡𝗦 — 𝗘𝗣𝗜𝗦𝗢𝗗𝗘 𝟯

Hiring machines vs owning machines

OWN THE MACHINE — OR HIRE WHAT YOU NEED?

Some businesses see owning machinery as an investment in their future. Others see hiring as a way to stay flexible and keep money available for the next opportunity.

Our big question:

“Does owning your machinery make your business stronger — or tie up money that could work harder elsewhere?”
There’s a case for both.

𝗧𝗵𝗲 𝗰𝗮𝘀𝗲 𝗳𝗼𝗿 𝗼𝘄𝗻𝗶𝗻𝗴:
▪️ Control over availability, maintenance and how the machine is used.
▪️ Potentially lower costs when it’s consistently working.
▪️ An asset you can sell when it’s time to change.

𝗧𝗵𝗲 𝗰𝗮𝘀𝗲 𝗳𝗼𝗿 𝗵𝗶𝗿𝗶𝗻𝗴:
▪️ Less money tied up in buying machinery.
▪️ The flexibility to match equipment to each job.
▪️ Servicing and breakdown support, depending on the hire agreement.

But let’s challenge both sides:
— Is a paid-for machine really “free” to run once you count repairs, insurance, storage, transport and depreciation?
— Does hiring still make sense when a machine is working almost every day?
— How much does an owned machine need to work before buying becomes the better decision?
— Does ownership give you control, or pressure you to keep a machine busy even when it isn’t right for the job?
— Do hire companies provide enough reliability and support to justify their rates?
— Is a mix of owned core machines and hired specialist equipment the best answer?

We’re a plant hire business, so you know our perspective — but we want to hear the strongest case for both sides.

💬 Tell us what you own, what you hire and why. Have you changed your approach after a costly lesson?

↗️ Share this with someone who takes the opposite view.

Real people. Real views. Real industry.

14/10/2026

The CFMOTO U10 PRO HIGHLAND is in stock at Sandhill Plant!

£19,999 +VAT +OTR

Built for hard work, with the power and comfort to take on your day:

✅ Powerful 998cc engine delivering 90hp
✅ Selectable 4WD for challenging terrain
✅ Power steering for easier handling
✅ Spacious three-person bench seat
✅ 1,134kg towing capacity for demanding jobs

Contact us for more information:
📞 01604 385350
📧 [email protected]

𝗧𝗛𝗘 𝗕𝗜𝗚 𝗤𝗨𝗘𝗦𝗧𝗜𝗢𝗡𝗦 — 𝗘𝗣𝗜𝗦𝗢𝗗𝗘 𝟮Late payments in UK constructionJOB DONE. STILL WAITING.You’ve supplied the machinery, deli...
14/10/2026

𝗧𝗛𝗘 𝗕𝗜𝗚 𝗤𝗨𝗘𝗦𝗧𝗜𝗢𝗡𝗦 — 𝗘𝗣𝗜𝗦𝗢𝗗𝗘 𝟮

Late payments in UK construction

JOB DONE. STILL WAITING.

You’ve supplied the machinery, delivered the materials or completed the work. Your own wages, fuel and bills still need paying.

So here’s our big question:

“Should contractors and suppliers be expected to fund a customer’s project while waiting to be paid?”

Agreed payment terms are one thing. Missing those terms is another. But are the terms themselves always fair?

Let’s get into the difficult questions:
▪️ If work is complete and agreed, what justifies payment terms of 60 or 90 days?
▪️ Is “we haven’t been paid yet” an acceptable reason to keep someone else waiting?
▪️ Can smaller businesses realistically refuse long payment terms, or does that mean losing the work?
▪️ If customers expect reliable service, should suppliers expect equally reliable payment?
▪️ Should repeat late payers face higher prices, pay upfront or lose access to credit?
▪️ When an invoice is genuinely disputed, how should both sides resolve it fairly without dragging out payment?

We want to hear from both sides — those chasing payment and those responsible for approving it.

💬 Pick a question and tell us where you stand. How has waiting for payment affected your business, and what would make the biggest difference?

Keep examples focused on the experience rather than naming individual businesses. Challenge the argument, respect the person.

↗️ Share this post and bring another perspective into the conversation.
Real people.

Real views. Real industry.

𝗧𝗛𝗘 𝗕𝗜𝗚 𝗤𝗨𝗘𝗦𝗧𝗜𝗢𝗡𝗦 — 𝗘𝗣𝗜𝗦𝗢𝗗𝗘 𝟭Net zero and UK constructionWho benefits — and who pays?Our first big question is:If billio...
12/10/2026

𝗧𝗛𝗘 𝗕𝗜𝗚 𝗤𝗨𝗘𝗦𝗧𝗜𝗢𝗡𝗦 — 𝗘𝗣𝗜𝗦𝗢𝗗𝗘 𝟭

Net zero and UK construction

Who benefits — and who pays?

Our first big question is:

If billions are being invested in making UK construction greener, should the average person working in construction be noticeably better off as a result?

Let’s get into the difficult questions:

▪️ Are the costs being passed down to smaller contractors and operators, while the commercial benefits stay at the top?

▪️ If a client demands greener machinery or methods, should they pay the extra — or should suppliers absorb the cost?

▪️ Should reliable older machinery be replaced to meet environmental requirements, or can keeping it working be the more responsible choice?

▪️ Are we rewarding genuine reductions in emissions, or the businesses that can afford the best paperwork?

▪️ Will customers still choose the greener option when it makes their project more expensive?

▪️ What should workers reasonably expect from this investment: better pay, better training, safer conditions or more secure jobs?

Pick one question and tell us where you stand. If you’ve faced this on a real job, share what happened and how it affected you.

Challenge the argument, respect the person. Different views are welcome — practical experience is what makes this conversation useful.

💬 Join the discussion below.
↗️ Share this post and bring someone with a different perspective into the conversation.

Real people. Real views. Real industry.

2020 Thwaites MACH201 1 Ton High Tip Skip Loader853 operating hoursFoldable ROPSAmber and green beaconsHydrostatic drive...
08/10/2026

2020 Thwaites MACH201 1 Ton High Tip Skip Loader

853 operating hours
Foldable ROPS
Amber and green beacons
Hydrostatic drive
Good tyres all round
Battery isolator

+VAT

Please call prior to arriving as we operate an incredibly busy plant yard and would prefer to have the machine out and ready to be viewed for when you arrive.

All additional accessories not included in the original description are not included in the sale, please speak to a member of the sales team regarding any additional systems (Leica, GKD, Camera Systems, Safety Shield etc)

Big questions deserve a proper conversation.We’re launching Sandhill Plant: The Big Questions — a five-week series explo...
07/10/2026

Big questions deserve a proper conversation.

We’re launching Sandhill Plant: The Big Questions — a five-week series exploring topics that affect people across the construction industry.

The intention is simple: to hear from the people working in it. We want to understand your experiences, hear different perspectives and encourage open, constructive discussion.

Each week, we’ll put one big question to you. Whatever your role, your view is welcome — and you don’t have to agree with us or anyone else to get involved.

Week 1 launches on 12 October, looking at net zero and UK construction.

Follow Sandhill Plant, share this post with your network and join the conversation throughout the series. Tag someone whose perspective you’d like to hear, too.

Real people. Real views. Real industry.

🟡  2024 JCB CT260-120 Tandem RollerOur 2nd JCB this week, this one with just 403 operating hours, ready to go!✅ 1,200mm ...
06/10/2026

🟡 2024 JCB CT260-120 Tandem Roller

Our 2nd JCB this week, this one with just 403 operating hours, ready to go!

✅ 1,200mm drum width
✅ Front, rear or double drum vibration
✅ Water sprinkler system
✅ Practically new scraper bars
✅ Simple controls and smooth directional drive
✅ Exceptionally clean

📩 Get in touch for pricing and further details.

☎️ 01604 385350
📨 [email protected]

🟡 JCB Roller Day at Sandhill Plant🟡 2024 JCB CT260-120 Tandem RollerJust 558 operating hours and a very, very tidy machi...
06/10/2026

🟡 JCB Roller Day at Sandhill Plant🟡

2024 JCB CT260-120 Tandem Roller

Just 558 operating hours and a very, very tidy machine — well worth a look.

✅ 1,200mm drum width
✅ Front, rear or double drum vibration
✅ Pressurised water sprinkler system
✅ Excellent drum-edge visibility for precise work
✅ Simple controls and smooth directional drive
✅ Adjustable drum offset for working around kerbs

📩 Get in touch for pricing and further details.

☎️ 01604 385350
📨 [email protected]

🟠 2017 HAMM HD12 VV Twin Drum RollerJust 720 operating hours — a compact roller with plenty to offer.✅ Vibration on both...
05/10/2026

🟠 2017 HAMM HD12 VV Twin Drum Roller

Just 720 operating hours — a compact roller with plenty to offer.

✅ Vibration on both drums
✅ Articulated steering for easy manoeuvring
✅ Excellent visibility of drum edges for precise work
✅ Simple controls and an ergonomic operator platform
✅ Compact design for working in restricted spaces

📩 Get in touch for pricing and further details.

☎️ 01604 385350
📨 [email protected]

Address

The Green Barn (rear) Brampton Lane
Pitsford
NN68BE

Alerts

Be the first to know and let us send you an email when Sandhill Plant and ATV posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sandhill Plant and ATV:

Shortcuts

Share