β‘ NEW MCCB PANEL SUPPLY IN BIRMINGHAM
The problem:
A factory needed a supply run from a 400amp switch to an MCCB panel, with as little disturbance to the site as possible.
The solution:
We installed 2x 95mm 4 core SWA cables in parallel from the 400amp switch to the MCCB panel.
The cable pull was done on night shifts to keep disruption to the factory to a minimum. We then came back at the weekend for a planned shutdown, powering the factory down so we could connect up both ends of the cable.
The result:
Parallel supply in place from the 400amp switch to the MCCB panel
Cable pull done out of hours
Final connections made during a well planned weekend shutdown
Good planning is what makes industrial work like this go smoothly. Swipe through for a few shots from the job.
π Volt Tech Electrical Solutions Ltd carries out industrial electrical work in Birmingham and across the West Midlands.